Id | Title |
---|---|
C703 | Accounting period missing |
C7030 | Start date is in the past: today scheduling |
C7031 | Control key & not found |
C7032 | Scheduling terminated: Scheduling parameters are missing |
C7033 | Constraint is before basic start date |
C7034 | Constraint is after basic finish date |
C7035 | Scheduled start is before basic start date |
C7036 | Scheduled finish is after basic finish date |
C7037 | Schedule conflict: Constraint is too early |
C7038 | Schedule conflict: Constraint is too late |
C7039 | Cannot keep within time constraint |
C704 | Fiscal year missing |
C7040 | Schedule conflict: Contradicting time constraints |
C7041 | No work center in the relationship (Operating time via calender from rel) |
C7042 | Relationship: No operating time maintained in work center for scheduling |
C7043 | Rel: No capacity category maintained in work center for scheduling |
C7044 | Relationship: Calendar does not exist |
C7045 | Relationship: No calendar specified |
C7046 | Rel: Work center does not exist |
C7047 | Rel: Field overflow when calculating the time interval |
C7048 | Rel: Date is not defined in factory calendar |
C7049 | Rel: Date cannot be converted into the internal format |
C705 | Company & not maintained in company master record |
C7050 | Rel: Error when converting into different quantity unit |
C7051 | Operating time not maintained for move in the move time matrix |
C7052 | Milestone &2: Date is not within the dates for activity &1 |
C7053 | Field overflow when calculating quantity |
C7054 | WBS date could not be converted |
C7055 | Division by 0 when calculating operation quantity |
C7056 | Capacity & not available |
C7057 | No valid capacity for finite scheduling |
C7058 | Relationships to other standard networks exist |
C7059 | Detailed scheduling level - Order & |
C706 | Too few spaces: transaction type texts may be overwritten |
C7060 | Rate-based scheduling level - Order & |
C7061 | Rough-cut scheduling level - Order & |
C7062 | ========================================================================= |
C7063 | Overlapping could not be maintained |
C7064 | Minimum overlap time could not be maintained |
C7065 | Order & is completely confirmed. Order basic dates unchanged |
C7066 | Error during scheduling of splits |
C7067 | Not all standard values maintained |
C7068 | Can delivery date for material & be kept? Realistic date: & |
C7069 | PRT: no master record found |
C707 | Too few spaces for transaction type (minimum no. of spaces = 3) |
C7070 | Relationship: Maximum duration could not be kept |
C7071 | Operation has been scheduled |
C7072 | After scheduling: Order starts in the past |
C7073 | Milestone &2: Date is not within the dates for WBS element &1 |
C7074 | Dates are set by external system |
C7075 | Overall network scheduling: Basic finish date before scheduled finish |
C7076 | Overall network scheduling: Basic start is after scheduled start |
C7077 | Overall netw. sched.: No conflicts between basic and scheduled dates |
C7078 | WBS element &: Forwards scheduling is not possible without a start date |
C7079 | WBS element &: Backwards scheduling is not possible without a finish date |
C708 | Too few spaces: company names may be overwritten |
C7080 | Program CX_TCX00 executed successfully |
C7081 | Program CX_TCX00 executed with a warning |
C7082 | Time units exist that are smaller and larger/equal to the day |
C7083 | WBS element &1: Scheduled start comes before the basic start date |
C7084 | WBS element &1: Scheduled finish comes after the basic finish date |
C7085 | Repetitive maufacturing: Midpoint sched. around work center &1 not poss. |
C7086 | In-house production time determined is greater than 999 days |
C709 | Too few spaces: currencies may be overwritten |
C7090 | Scheduling: Multiple commitment due to constraint dates |
C710 | Too few spaces between LW and VW |
C7100 | **** Messages which are not written into the log |
C7101 | Forward scheduling (enter start date) |
C7102 | Backward scheduling (enter finish date) |
C7103 | Capacity requirements calc. (enter start and finish date) |
C7104 | Start date must not be later than finish date |
C7105 | Start date is in the past |
C7106 | Finish date is in the past |
C7107 | Enter a valid scheduling type |
C7108 | Lot size is not within selected lot size range |
C7109 | Basic finish date is after requirements date & |
C711 | Item no. and item text missing |
C7110 | Outline finish date is after requirements date & |
C7111 | Check if rate-based scheduling is appropriate -> see long text |
C7112 | Dependency is too complicated; routing & , sequence & , operation & |
C7118 | Scheduling has not yet been carried out |
C7119 | Scheduling log does not contain any entries |
C712 | Form has & balance - correct to 0 balance |
C7120 | Outline finish date could not be kept |
C7121 | Outline start date could not be kept |
C713 | Column structure & is not complete for language & |
C7130 | ********* Texts for X messsages ***************************************** |
C7131 | Status object &1 in operation &2 order &3 is invalid |
C7132 | Error while creating internal table operation for order number & |
C7133 | Scheduling termination: Invalid scheduling time |
C7134 | Error while creating internal table Order for order number &1 |
C7135 | Error while reading internal table Operation |
C7136 | Error whiel reading internal table Order |
C7137 | Selection criteria not allowed for capacities |
C7138 | Incorrect access to the capacity document table during availability check |
C7139 | Key field for operation in capacity requirements record KBED incorrect |
C7140 | Error during scheduling of splits |
C7141 | Error while reading capacities with version numbers |
C7142 | error while reading capacities with splits |
C7144 | WBS element/project scheduling: No date has been entered |