SAP Messages

Id Title
C703 Accounting period missing
C7030 Start date is in the past: today scheduling
C7031 Control key & not found
C7032 Scheduling terminated: Scheduling parameters are missing
C7033 Constraint is before basic start date
C7034 Constraint is after basic finish date
C7035 Scheduled start is before basic start date
C7036 Scheduled finish is after basic finish date
C7037 Schedule conflict: Constraint is too early
C7038 Schedule conflict: Constraint is too late
C7039 Cannot keep within time constraint
C704 Fiscal year missing
C7040 Schedule conflict: Contradicting time constraints
C7041 No work center in the relationship (Operating time via calender from rel)
C7042 Relationship: No operating time maintained in work center for scheduling
C7043 Rel: No capacity category maintained in work center for scheduling
C7044 Relationship: Calendar does not exist
C7045 Relationship: No calendar specified
C7046 Rel: Work center does not exist
C7047 Rel: Field overflow when calculating the time interval
C7048 Rel: Date is not defined in factory calendar
C7049 Rel: Date cannot be converted into the internal format
C705 Company & not maintained in company master record
C7050 Rel: Error when converting into different quantity unit
C7051 Operating time not maintained for move in the move time matrix
C7052 Milestone &2: Date is not within the dates for activity &1
C7053 Field overflow when calculating quantity
C7054 WBS date could not be converted
C7055 Division by 0 when calculating operation quantity
C7056 Capacity & not available
C7057 No valid capacity for finite scheduling
C7058 Relationships to other standard networks exist
C7059 Detailed scheduling level - Order &
C706 Too few spaces: transaction type texts may be overwritten
C7060 Rate-based scheduling level - Order &
C7061 Rough-cut scheduling level - Order &
C7062 =========================================================================
C7063 Overlapping could not be maintained
C7064 Minimum overlap time could not be maintained
C7065 Order & is completely confirmed. Order basic dates unchanged
C7066 Error during scheduling of splits
C7067 Not all standard values maintained
C7068 Can delivery date for material & be kept? Realistic date: &
C7069 PRT: no master record found
C707 Too few spaces for transaction type (minimum no. of spaces = 3)
C7070 Relationship: Maximum duration could not be kept
C7071 Operation has been scheduled
C7072 After scheduling: Order starts in the past
C7073 Milestone &2: Date is not within the dates for WBS element &1
C7074 Dates are set by external system
C7075 Overall network scheduling: Basic finish date before scheduled finish
C7076 Overall network scheduling: Basic start is after scheduled start
C7077 Overall netw. sched.: No conflicts between basic and scheduled dates
C7078 WBS element &: Forwards scheduling is not possible without a start date
C7079 WBS element &: Backwards scheduling is not possible without a finish date
C708 Too few spaces: company names may be overwritten
C7080 Program CX_TCX00 executed successfully
C7081 Program CX_TCX00 executed with a warning
C7082 Time units exist that are smaller and larger/equal to the day
C7083 WBS element &1: Scheduled start comes before the basic start date
C7084 WBS element &1: Scheduled finish comes after the basic finish date
C7085 Repetitive maufacturing: Midpoint sched. around work center &1 not poss.
C7086 In-house production time determined is greater than 999 days
C709 Too few spaces: currencies may be overwritten
C7090 Scheduling: Multiple commitment due to constraint dates
C710 Too few spaces between LW and VW
C7100 **** Messages which are not written into the log
C7101 Forward scheduling (enter start date)
C7102 Backward scheduling (enter finish date)
C7103 Capacity requirements calc. (enter start and finish date)
C7104 Start date must not be later than finish date
C7105 Start date is in the past
C7106 Finish date is in the past
C7107 Enter a valid scheduling type
C7108 Lot size is not within selected lot size range
C7109 Basic finish date is after requirements date &
C711 Item no. and item text missing
C7110 Outline finish date is after requirements date &
C7111 Check if rate-based scheduling is appropriate -> see long text
C7112 Dependency is too complicated; routing & , sequence & , operation &
C7118 Scheduling has not yet been carried out
C7119 Scheduling log does not contain any entries
C712 Form has & balance - correct to 0 balance
C7120 Outline finish date could not be kept
C7121 Outline start date could not be kept
C713 Column structure & is not complete for language &
C7130 ********* Texts for X messsages *****************************************
C7131 Status object &1 in operation &2 order &3 is invalid
C7132 Error while creating internal table operation for order number &
C7133 Scheduling termination: Invalid scheduling time
C7134 Error while creating internal table Order for order number &1
C7135 Error while reading internal table Operation
C7136 Error whiel reading internal table Order
C7137 Selection criteria not allowed for capacities
C7138 Incorrect access to the capacity document table during availability check
C7139 Key field for operation in capacity requirements record KBED incorrect
C7140 Error during scheduling of splits
C7141 Error while reading capacities with version numbers
C7142 error while reading capacities with splits
C7144 WBS element/project scheduling: No date has been entered
Lines 117001 to 117100 of 607611 entries