| C703 |
Accounting period missing |
| C7030 |
Start date is in the past: today scheduling |
| C7031 |
Control key & not found |
| C7032 |
Scheduling terminated: Scheduling parameters are missing |
| C7033 |
Constraint is before basic start date |
| C7034 |
Constraint is after basic finish date |
| C7035 |
Scheduled start is before basic start date |
| C7036 |
Scheduled finish is after basic finish date |
| C7037 |
Schedule conflict: Constraint is too early |
| C7038 |
Schedule conflict: Constraint is too late |
| C7039 |
Cannot keep within time constraint |
| C704 |
Fiscal year missing |
| C7040 |
Schedule conflict: Contradicting time constraints |
| C7041 |
No work center in the relationship (Operating time via calender from rel) |
| C7042 |
Relationship: No operating time maintained in work center for scheduling |
| C7043 |
Rel: No capacity category maintained in work center for scheduling |
| C7044 |
Relationship: Calendar does not exist |
| C7045 |
Relationship: No calendar specified |
| C7046 |
Rel: Work center does not exist |
| C7047 |
Rel: Field overflow when calculating the time interval |
| C7048 |
Rel: Date is not defined in factory calendar |
| C7049 |
Rel: Date cannot be converted into the internal format |
| C705 |
Company & not maintained in company master record |
| C7050 |
Rel: Error when converting into different quantity unit |
| C7051 |
Operating time not maintained for move in the move time matrix |
| C7052 |
Milestone &2: Date is not within the dates for activity &1 |
| C7053 |
Field overflow when calculating quantity |
| C7054 |
WBS date could not be converted |
| C7055 |
Division by 0 when calculating operation quantity |
| C7056 |
Capacity & not available |
| C7057 |
No valid capacity for finite scheduling |
| C7058 |
Relationships to other standard networks exist |
| C7059 |
Detailed scheduling level - Order & |
| C706 |
Too few spaces: transaction type texts may be overwritten |
| C7060 |
Rate-based scheduling level - Order & |
| C7061 |
Rough-cut scheduling level - Order & |
| C7062 |
========================================================================= |
| C7063 |
Overlapping could not be maintained |
| C7064 |
Minimum overlap time could not be maintained |
| C7065 |
Order & is completely confirmed. Order basic dates unchanged |
| C7066 |
Error during scheduling of splits |
| C7067 |
Not all standard values maintained |
| C7068 |
Can delivery date for material & be kept? Realistic date: & |
| C7069 |
PRT: no master record found |
| C707 |
Too few spaces for transaction type (minimum no. of spaces = 3) |
| C7070 |
Relationship: Maximum duration could not be kept |
| C7071 |
Operation has been scheduled |
| C7072 |
After scheduling: Order starts in the past |
| C7073 |
Milestone &2: Date is not within the dates for WBS element &1 |
| C7074 |
Dates are set by external system |
| C7075 |
Overall network scheduling: Basic finish date before scheduled finish |
| C7076 |
Overall network scheduling: Basic start is after scheduled start |
| C7077 |
Overall netw. sched.: No conflicts between basic and scheduled dates |
| C7078 |
WBS element &: Forwards scheduling is not possible without a start date |
| C7079 |
WBS element &: Backwards scheduling is not possible without a finish date |
| C708 |
Too few spaces: company names may be overwritten |
| C7080 |
Program CX_TCX00 executed successfully |
| C7081 |
Program CX_TCX00 executed with a warning |
| C7082 |
Time units exist that are smaller and larger/equal to the day |
| C7083 |
WBS element &1: Scheduled start comes before the basic start date |
| C7084 |
WBS element &1: Scheduled finish comes after the basic finish date |
| C7085 |
Repetitive maufacturing: Midpoint sched. around work center &1 not poss. |
| C7086 |
In-house production time determined is greater than 999 days |
| C709 |
Too few spaces: currencies may be overwritten |
| C7090 |
Scheduling: Multiple commitment due to constraint dates |
| C710 |
Too few spaces between LW and VW |
| C7100 |
**** Messages which are not written into the log |
| C7101 |
Forward scheduling (enter start date) |
| C7102 |
Backward scheduling (enter finish date) |
| C7103 |
Capacity requirements calc. (enter start and finish date) |
| C7104 |
Start date must not be later than finish date |
| C7105 |
Start date is in the past |
| C7106 |
Finish date is in the past |
| C7107 |
Enter a valid scheduling type |
| C7108 |
Lot size is not within selected lot size range |
| C7109 |
Basic finish date is after requirements date & |
| C711 |
Item no. and item text missing |
| C7110 |
Outline finish date is after requirements date & |
| C7111 |
Check if rate-based scheduling is appropriate -> see long text |
| C7112 |
Dependency is too complicated; routing & , sequence & , operation & |
| C7118 |
Scheduling has not yet been carried out |
| C7119 |
Scheduling log does not contain any entries |
| C712 |
Form has & balance - correct to 0 balance |
| C7120 |
Outline finish date could not be kept |
| C7121 |
Outline start date could not be kept |
| C713 |
Column structure & is not complete for language & |
| C7130 |
********* Texts for X messsages ***************************************** |
| C7131 |
Status object &1 in operation &2 order &3 is invalid |
| C7132 |
Error while creating internal table operation for order number & |
| C7133 |
Scheduling termination: Invalid scheduling time |
| C7134 |
Error while creating internal table Order for order number &1 |
| C7135 |
Error while reading internal table Operation |
| C7136 |
Error whiel reading internal table Order |
| C7137 |
Selection criteria not allowed for capacities |
| C7138 |
Incorrect access to the capacity document table during availability check |
| C7139 |
Key field for operation in capacity requirements record KBED incorrect |
| C7140 |
Error during scheduling of splits |
| C7141 |
Error while reading capacities with version numbers |
| C7142 |
error while reading capacities with splits |
| C7144 |
WBS element/project scheduling: No date has been entered |