Diagnosis You are attempting to set the scheduling> and/or capacityplanning> indicators for several scheduling levels. Please note thefollowing: Because rough-cut, rate-based and detailed planning levels are entirelydifferent and production orders can only be updated on the detailedplanning level, problems may occur when calculating capacityrequirements. If you convert a planned order into a production order, only thedetailed planning view is updated when you make changes in theproduction order. In detailed planning, the capacity requirementscalculated for rate-based planning are the same as they were for thelast planning status for rate-based scheduling of the planned order. Setting the indicators for several scheduling levels means that anorder is scheduled at each level which causes a decrease inperformance. If possible, set the indicator for only one schedulinglevel.Procedure If you want to schedule on several different levels at the same time,you have to set the parameters for capacity planning and scheduling insuch a way that only one scheduling level is used to determine theorder basic dates. If you already set the scheduling> and/or capacityplanning> indicators for
|