SAP Messages

Id Title
C2261 Sub-operation &1 for order &2 sequence &3 operation &4 selected also
C2262 Component &1 item &2 for order &3 operation &4 was selected also
C2263 PRT &1 for order &2 operation &3 was also selected
C2264 Purchase requisition &1 &2 for order &3 operation &4 was selected also
C2265 Network was not read completely - configuration can only be displayed
C2266 Purchase order available for operation &
C2267 Planning order & requires stock transfer
C2268 WBS element &1 of the order is not the same as WBS element &2
C2269 Sales order &1 item &2 of the order is not in selection criteria
C227 Company & has not been maintained for subgroup ledger &
C2270 Change to control key not allowed: Operation has been confirmed
C2271 No control key has been maintained for operation &1 of order &2
C2272 Batch assignment in order & is not sufficient
C2273 Copying link to document &1, document part &2, version &3
C2274 Material withdrawal already posted for order
C2275 Transfer requirements aready exist for order
C2276 Goods receipt posted: You cannot add a co-product
C2277 Goods receipt posted: Co-product is added as a by-product
C2278 Change to the WBS element: Collective order not completely imported
C2279 WM-relevant component &1 cannot be reassigned
C228 Entry in FI to closed period. Repeat input for CoID & in subgroup &
C2280 Order &1: Reservations are no longer MRP-relevant
C2281 Negative quantity not allowed for externally-procured component &1
C2282 Max. of &1 select. conditions possible. You have maintained &2 conditions
C2283 Master data in order &1 are no longer current
C2284 Master data in reference order are no longer current
C2285 No batch determination for directly-produced components (item & &)
C2286 Component &1 with backflush indicator cannot be reassigned
C2287 Backflush: Control key & should allow confirmation
C2288 Assembly order: Import total collective order
C2289 Updating superordinate reservation with changed data
C229 Not all of the companies of the subgroup have been translated.
C2290 Material &1/&2: Components and operations can only be copied together
C2291 Order &1, sequence &2 exists twice in operation &3 &4
C2292 Selection of production version in the batch input
C2293 Order &1 is already technically completed
C2294 It was not possible to select a routing automatically
C2295 Unexpected COMMIT WORK
C2296 Archiving was terminated because of errors
C2297 The print program should support PDF output for PDF form &1
C2298 No SAPscript form defined for list &1 (ref. order type &2, report &3)
C2299 No PDF form defined for list &1 (reference order type &2, report &3)
C230 Data input opened for company &
C2300 Status text for object & in order & could not be determined
C2301 Number of displayed orders limited to &1 (&2 orders selected)
C2302 Collective availability check cancelled (error while resetting)
C2303 A previously used distribution rule already exists
C2304 Configuration in order & is invalid for current date
C2305 Order &1 is assigned to account of order &2
C2306 Balance is not zero for order &
C2307 You have not entered a PDF-based form
C2308 Planned order &1 does not contain any reservations for phantom assemblies
C2309 First execute planning run (multi-level) for material &1
C231 Data entry blocked for company &
C2310 WBS element & not (partially) released
C2311 Component & item & cannot be deleted (see long text)
C2312 No more free item numbers (Please check)
C2313 User status & prohibits scheduling. Enter a date
C2314 Component &1 item &2 must not be deleted (+/- components)
C2315 Routing & is flagged for deletion
C2316 Choose the object 'components'
C2317 User status prevents deletion of inspection lot &2
C2318 Number of selected planned orders restricted to 9999
C2319 Registration for configuration is not possible for order & and object &
C232 Standardizing entries opened for company &
C2320 Production scheduling profile &1 is already being used
C2321 Scheduling terminated: Total commitment date does not exist
C2322 No data in archive for instance &
C2323 Settlement rule contains errors and has not been saved
C2324 Order &1 still has open deliveries
C2325 Error occurred during creation of purchase requisition for operation &
C2326 There are open deliveries for material &1 item &2
C2327 Inconsistent data: &1, duplicate entry &2
C2328 Order was not saved
C2329 Final order number is determined before save
C233 Standardizing entries blocked for company &
C2330 Apportionment structure &2 automatically determined for material &1
C2331 Parallel processing not possible for this function
C2332 Parallel processing not confirmed: Function possibly not executed
C2333 Picking performed, successful: &1, unsuccessful: &2
C2334 Transaction terminated, picking not saved
C2335 In operation & of sequence & work center & in plant & is locked
C2336 Errors during plan explosion; transaction terminated
C2337 Plan was not exploded due to errors!
C2338 Operation &1/seq. &2: Work center &3 (plant &4) is flagged for deletion
C2339 A purchase order with parts already exists for operation &
C234 Currency translation opened for company &
C2340 The activity types for work centers &1 and &2 are different
C2341 WBS element &1 is assigned to order &2
C2342 Network &1 is assigned to order &2
C2343 Network activity &1 &2 is assigned to order &3
C2344 Object &1 &2 is assigned to order &3
C2345 The system was unable to create the settlement rule
C2346 Comp. &1 deleted because material &2 is locked (discontinuation group &3)
C2347 Purchase requisition could not be created during mass conversion
C2348 For OCM read order task list and BOM
C2349 Long text will be overwritten with standard text
C235 Currency translation blocked for company &
C2350 Error during generation of settlement rules for co-products
C2351 No storage location maintained for order item &2
Lines 116101 to 116200 of 607611 entries
1 1,160 1,161 1,162 1,163 1,164 6,077