Id | Title |
---|---|
61253 | You change only change & in single-level BOM/structure representation |
61254 | Storage location '&' for material '&' in MRP area '&' planned separately |
61255 | Error reading the BOM & & |
61256 | Invalid unit of measure for components & & |
61257 | Up to &, only & can be confirmed. Requested & |
61258 | Configured BOM could not be exploded |
61259 | Material requires configuration |
6126 | Indicator cannot be set/deleted not possible (documents exist) |
61260 | Project and/or WBS element not complete |
61261 | Project does not allow individual project production |
61262 | Project and/or WBS element does not exist |
61263 | Missing configuration in planned order &1 |
61264 | Missing configuration in sales requirement &1 |
61265 | You can maintain the components by exploding the BOM |
61266 | Total requirement & does not exist |
61267 | Project &1 is not an account assignment element |
61268 | Please check the selection parameters |
61269 | Column with rescheduling date shown |
6127 | New version copied from & & & & |
61270 | ***** COMMENT: Messages for missing table entries |
61271 | MRP controller '&1' for material '&2' does not exist |
61272 | Plant '&1' does not exist |
61273 | MRP parameters for plant '&1' have not been maintained |
61274 | No entry exists for plant &, material type & in V134M |
61275 | Material & does not exist |
61276 | Material status &1 does not exist for material &2 |
61277 | Release indicator &1 not allowed for purchase requisition &2 |
61278 | MRP type &1 not allowed for material &2 |
61279 | Lot-sizing procedure &1 not allowed for material &2 |
6128 | Error uploading & |
61280 | Range of coverage profile &1 does not exist |
61281 | No entries in Table &1 found |
61282 | &1 / &2 / &3 is an invalid combination or action code not allowed |
61283 | Unknown action code &1 |
61284 | No entry for &1, &2, &3 in the list profiles |
61285 | No action code(s) copied |
61286 | No print data exists |
61287 | Splitting indicator &1 does not exist |
61288 | Exception message &1 or exception message text does not exist |
61289 | Special procurement key &1 not defined in plant &2 |
6129 | Data transferred by SAP |
61290 | Text for MRP element &1 not maintained in language &2 |
61291 | Action &2 executed for planned order &1 |
61292 | Please enter action code |
61293 | Storage location &2 in plant &1 does not exist |
61294 | No entry exists for plant &1 in plant Table |
61295 | No entry exists for unit &1 in Table of units |
61296 | "Firm" and "Delete firm ind." set at the same time |
61297 | Combination "detete" and "print" not allowed |
61298 | Action &1 cannot be executed together with another action |
61299 | Action &1 requires the update within the module |
6130 | Error downloading & |
61300 | Components were deleted |
61301 | No components were deleted |
61302 | Storage location & does not exist |
61303 | & batch does not exist |
61304 | Storage location &1 not maintained for material &2 in plant &3 |
61305 | The withdrawn quantity (partially) exceeds the requirement quantity |
61306 | No customer requirements exist for materials selected |
61307 | Unit of measure conversion for material &1 of &2 terminated in &3 |
61308 | Scope of planning '&1' does not exist. |
61309 | Planning run for scope of planning is only possible in parallel mode |
6131 | Document is marked for deletion |
61310 | The order was already checked according to ATP logic |
61311 | No planned independent requirements maintained for material |
61312 | Plant / MRP area does not exist in scope of planning |
61313 | Capacity has already been planned for the order |
61314 | Planning run with scope of planning. Delete scope of plng for plant plng |
61315 | Planning file (DBVM) is empty |
61316 | Selected scope of planning &1 is empty |
61317 | Selected scope of planning &1 is empty. Please fill or delete |
61318 | Component &1 cannot be deleted |
61319 | Two quantity columns inserted in unit of measure & |
6132 | No search criteria were entered: timeout ! |
61320 | Plg calendar n.maintained far enough into future or per.of entry too smll |
61321 | Period profile &1 is not allowed to be used for plant &2 |
61322 | Planned order &1 may not be changed |
61323 | Schedule records are being deleted |
61324 | Columns with vendor data shown |
61325 | Columns with customer data inserted |
61326 | Pegged order & does not exist |
61327 | Navigation profile & does not exist |
61328 | Please maintain the account assignment data |
61329 | Date &1 for element &2 &3 &4 is not within the factory calendar |
6133 | Function & is not active |
61330 | Manual firming date &1 set |
61331 | Manual firming date &1 deleted |
61332 | Action &1 is not possible for simulative planned orders |
61333 | Quantity overflow when saving schedule lines for material & |
61334 | Quantity overflow when importing MRP elements for material & |
61335 | BOM is not valid: &1, &2, &3, &4 |
61336 | Several main parts in discontinuation group &1 |
61337 | Sales order planning/project planning not possible for material &1 &2 |
61338 | Single item planning in simultation mode not possible for material &1 &2 |
61339 | Time stamp problem: Changes to planned order '&1' terminated |
6134 | Revision levels already exist for & / & / & |
61340 | ******* COMMENT: 340- BOM explosion number checks |
61341 | BOM explosion number & is not active |
61342 | BOM explosion number & is only valid in plant & |
61343 | BOM explosion number & is only valid for material & in plant & |