Diagnosis Planned orders for a configurable material must have a configurationvaluation. If this does not exist, an error occurs. System Response The BOM for this planned order cannot be exploded which causes atermination when planning the material in MRP. Procedure Determine the cause of the error and correct it. Delete the incorrect planned order and then repeat the planning run forthe material. |