SAP Message 61259 - Material requires configuration

Diagnosis
Orders and requirements for a configurable material must havecharacteristic values.
Usually, you should create a variation for configurable materialsmanaged in inventory management which has the default variantconfiguration.

System Response
MRP: Requirements without characteristic values for a material cannotbe planned in MRP.

Procedure
Check requirements or orders.
Create a configuration evaluation for the material in the materialmaster record if necessary.

132890Charctristics planning: supportng points not stored
316204Configuration in subcontracting scheduling agreement
89469Termination of MRP run with system message 61259