| RU129 |
First selected confirmation reached |
| RU130 |
Goods movement could not be posted in the background |
| RU131 |
Personnel master & does not exist in plant & (Check entries) |
| RU132 |
Material & not found in plant & (check entry) |
| RU133 |
Material & & is not handled in batches |
| RU134 |
Batch & & & & not found (check entry) |
| RU135 |
Storage location & not found for material & in plant & |
| RU136 |
Storage location & not yet created for material & |
| RU137 |
Structure explosion not possible for technical object in order & |
| RU138 |
Order & has no object reference |
| RU139 |
Overdelivery is not permitted (Check entry) |
| RU140 |
Position the cursor on a filled field |
| RU141 |
Goods movements redetermined due to quantity change |
| RU142 |
Confirmation triggered by milestone |
| RU143 |
Confirmation is part of milestone confirmation - Check goods movements |
| RU144 |
Confirmation is milestone confirmation - Check goods movements |
| RU145 |
Deviation of work is maintained, but not active -> please check |
| RU146 |
Deviation of duration is maintained, but not active -> please check |
| RU147 |
No goods movements were posted with the confirmation |
| RU148 |
Unit & does not exist -> check your entry |
| RU149 |
Dimensions differ between unit entered (&) and op. unit & |
| RU150 |
Save manually entered confirmations before saving standard confirmation |
| RU151 |
Enter order number |
| RU152 |
Error when assigning number for object & |
| RU153 |
Internal number assignment for object & (numbers are in critical area) |
| RU154 |
Internal number assignment for object (last number was assigned) |
| RU155 |
Confirmations were created at header level for order & |
| RU156 |
Confirmations have been entered at operation level for order & |
| RU157 |
Confirmation with counter & does not exist/has been cancelled |
| RU158 |
Internal no. assignment for error record document: No. in critical area |
| RU159 |
Internal assignment of doc. no. error record: last number assigned |
| RU160 |
You have reached the last selected operation |
| RU161 |
You have reached the first elected operation |
| RU162 |
The degree of processing is already & % |
| RU163 |
Number of confirmations saved for order &: & |
| RU164 |
& confirmations saved (goods movements: &, errors: &) |
| RU165 |
Operation without unit: unit & is copied into the operation |
| RU166 |
Error in number assignment for error document (goods movement) |
| RU167 |
Entering a final confirmation will set the remaining work to zero |
| RU168 |
Entry 'No remaining work': Entry is set to zero |
| RU169 |
Not enough data entered to select operation |
| RU170 |
You are not authorized to carry out a confirmation |
| RU171 |
Operation does not exist (check entry) |
| RU172 |
Operation cannot be selected due to parameter settings |
| RU173 |
Network & is deleted (you can no longer enter a confirmation) |
| RU174 |
Confirmation data are incorrect |
| RU175 |
Error document & & for material & is being processed |
| RU176 |
Confirmation does not exist or has been cancelled |
| RU177 |
You are not authorized to process work center & & |
| RU178 |
Invalid confirmation record class & |
| RU179 |
Mixed confirmation types (time ticket/time event) are not allowed |
| RU180 |
Sequence of time events not adhered to |
| RU181 |
Quantity deviation for GR items from inspection points |
| RU182 |
You can only process one pool per transaction |
| RU183 |
Enter either user or organizational unit |
| RU184 |
Enter organizational unit and type |
| RU185 |
Enter an agent |
| RU186 |
Select an operation with confirmation(s) |
| RU187 |
System: Wrong application |
| RU188 |
Individual capacity & / & does not exist (check entry) |
| RU189 |
Final confirmation exists for indiv. cap. &/& |
| RU190 |
Individual cap. &/& is already manually confirmed |
| RU191 |
Select an individual capacity |
| RU192 |
No individual capacities exist |
| RU193 |
Goods movements are posted on & |
| RU194 |
& PDC error records processed |
| RU195 |
Automatic goods receipt for order & is not possible |
| RU196 |
You have no authorization for order type & plant & |
| RU197 |
No. of confirmations saved: & |
| RU198 |
No error records exist for selection criteria specified |
| RU199 |
Confirmation was entered in a different application |
| RU200 |
************************** N e t w o r k s ****************************** |
| RU201 |
Select a confirmation line |
| RU202 |
Start date is later than finish date - please check |
| RU203 |
Start time is later than finish time - check entry |
| RU204 |
Unit & is not a time unit - enter a time unit |
| RU205 |
Maintain a unit for the duration |
| RU206 |
Enter confirmation or network |
| RU207 |
Activity & not found in network & |
| RU208 |
Activity & element & not found in network & |
| RU209 |
Actual date(s) is in the future (check parameters) |
| RU210 |
Work is confirmed - maintain the work center |
| RU211 |
Enter either forecast finish or forecast duration |
| RU212 |
Network & contains no activities (check entry) |
| RU213 |
Select an operation |
| RU214 |
No (open) element found for activity & |
| RU215 |
Activity & does not require confirmation/is not open |
| RU216 |
Activity & element & does not require confirmation/is not open |
| RU217 |
You have maintained the actual work - please enter a unit of measure |
| RU218 |
Actual work + remaining work deviates by more than &% from planned work |
| RU219 |
Actual duration + remaining duration deviates by more than &% from schd. |
| RU220 |
No open activity exists for network & |
| RU221 |
Network & has not yet been confirmed |
| RU222 |
Internal error in processing of long text |
| RU223 |
Varying dimension for work units |
| RU224 |
Network & is already being processed |
| RU225 |
Unit & is invalid |
| RU226 |
Date & is before the end of factory calendar & |
| RU227 |
Date & is before the end of factory calendar & |
| RU228 |
Start date cannot be determined (calendar &) |