Diagnosis The order does not refer to an object. System Response The system checks whether a structure explosion is possible for the technical object (equipment or functional location). If a technicalobject has not been entered in the order, a structure explosion is notpossible. Procedure The function is only possible if the order refers to an object. You canuse an order maintenance transaction to enter an object reference. |