| RM002 |
Invalid entry in table & |
| RM003 |
Routing & & & does not exist |
| RM004 |
Error determining the supply area for WM |
| RM005 |
Dependent requirements are already blocked |
| RM006 |
WM material provision carried out successfully |
| RM007 |
Specific. of warehouse coordinates for mat. & in plant & not correct |
| RM008 |
No open components exist for WM provision |
| RM009 |
WM provision for part of the components already carried out |
| RM010 |
General settings in Customizing not maintained for repetitive mfg |
| RM011 |
Internal program error ( & & & & ) |
| RM012 |
Statistic S025 and S225 not to be updated according to LIS Customizing |
| RM013 |
Routing not defined for mat. & and production version & |
| RM014 |
Entry of actual data not allowed according to status check |
| RM015 |
According to selections, no production version is to be costed |
| RM016 |
BOM for material & and production version & not defined |
| RM017 |
Dependent requirements of RS quantities of & & adjusted |
| RM018 |
Dependent requirements will be adjusted |
| RM019 |
Error in stock determination caused termination |
| RM020 |
User &1 is blocking production version &2 of mat. &3 |
| RM021 |
No production versions could be found for selection |
| RM022 |
Production lot &2 is blocked by user &1 |
| RM023 |
Change not possible as similar postprocessing records created |
| RM024 |
Confirmation for prodn lot only poss. in case of nonvaluated proj. stock |
| RM025 |
No cost estimate possible for this product cost collector |
| RM026 |
A new costing is carried out for product cost collector &1 |
| RM027 |
Inventory Mgmt: Sufficient qties of material & in plant & not available |
| RM028 |
Routing &1 &2 &3 contains no reporting points |
| RM029 |
Product cost collector &1 cannot be determined |
| RM030 |
Run schedule quantities still exist for production version &1 |
| RM031 |
Dependent requirements for material & / production version & not adjusted |
| RM032 |
Plant &1 does not exist |
| RM040 |
Repetitive manufacturing profile &1 inconsistent |
| RM041 |
Choose a valid row or terminate the dialog |
| RM045 |
Material & in plant & marked for deletion |
| RM050 |
Enter either a reference qty or choose "Components" |
| RM051 |
Enter reference quantity or choose "activities" |
| RM053 |
Movement type & not maintained |
| RM054 |
Serial numbers with automatic batch number assignment not supported |
| RM055 |
Movement types & and & are not consistent |
| RM056 |
Serial numbers with partial reversal not supported |
| RM057 |
Entry of act. data w. activity posting and partial reversal not supported |
| RM060 |
Cancellation terminated because backlogs from backflushing exist |
| RM061 |
No PDC confirmation number transferred |
| RM062 |
No confirmation number transferred |
| RM065 |
No. of serial numbers assigned does not correspond to confirmation qty |
| RM066 |
No production type was selected |
| RM070 |
Error reading document log information & |
| RM071 |
Cancellation for & because material document exists in document log |
| RM073 |
No document log information exists for the selection criteria |
| RM074 |
First confirm the reporting points individually |
| RM075 |
The worklist is empty for these selection options |
| RM076 |
No confirmation processes to be carried out selected |
| RM078 |
Error determining the cost estimate |
| RM079 |
Material & in plant & not defined as a reporting point material |
| RM080 |
Entry of actual data at reporting point for mat. & in plant & not allowed |
| RM081 |
Reporting point & for material &, plant &, version &, does not exist |
| RM082 |
Error updating the reporting point quantity |
| RM083 |
Confirm. qty for reporting point exceeds confirmed qty for predecessor RP |
| RM084 |
You have not entered reporting point & for material &, plant &, version & |
| RM085 |
GR confirmation quantity exceeds qty confirmed for last reporting point |
| RM086 |
No GR with backflush in case of reporting point logic w. autom. GR option |
| RM087 |
Further operations have been defined after the last reporting point |
| RM088 |
GR quantity > RP quantities: Temporary requirement inconsistency possible |
| RM090 |
Error reading the special stock for material & and vendor & |
| RM093 |
Specify a plant |
| RM094 |
Rep. point does not exist as operation in standard cost estimate |
| RM095 |
Error resetting the reporting point quantities due to inconsistencies |
| RM096 |
Goods receipt now, backflush later, not for reporting point material |
| RM097 |
Cost estimate created for material & with version & in plant & |
| RM098 |
Enter material, plant and production version first |
| RM099 |
Error creating cost estimate for material & with percentage & in plant & |
| RM100 |
Material & does not exist in plant & |
| RM102 |
To storage location & does not exist for material & in plant & |
| RM103 |
To storage location & in plant & does not exist |
| RM104 |
Costing variant & does not exist |
| RM105 |
No costing variant exists in product cost collector &1 |
| RM106 |
Costing type & does not exist or is not allowed |
| RM107 |
The quantities of all reporting points are initial |
| RM108 |
Reporting points for material &, version & reduced successfully |
| RM109 |
Quantity at reporting point &1 less than quantity at follow-on RP |
| RM110 |
Repetitive manufacturing not allowed for material & in plant & |
| RM111 |
Error reading reporting point information |
| RM112 |
Error determining the cost collector |
| RM113 |
REM profile &1 is not correctly maintained for material |
| RM114 |
Ord.type in cost collec.does not suit the definition in the RM profile |
| RM115 |
Incorrect order type in REM profile |
| RM116 |
Product cost collector & & & was not found |
| RM117 |
No backlog exists for run schedule header & |
| RM118 |
Blocking indicator is set in run schedule header & |
| RM119 |
Stge loc. & for material & in plant & does not exist |
| RM120 |
Run schedule header & cannot be selected |
| RM121 |
RS header for mat. &, version & in plant & and this date does not exist |
| RM122 |
Run schedule header for material & in plant & does not exist |
| RM123 |
No postprocessing records exist for these selection criteria |
| RM124 |
Confirm. qty > plnd order qty (There will be overdelivery for pl. order) |
| RM125 |
No planned orders available for sales order. BOM is exploded |
| RM126 |
Yield confirmed too large |
| RM127 |
Scrap quantity confirmed too large |
| RM128 |
Planned order &1 not allowed for make-to-order production |
| RM129 |
Please enter a material |