SAP Message RM088 - GR quantity > RP quantities: Temporary requirement inconsistency possible

Diagnosis
The goods receipt quantity to be backflushed is greater than at leastone reporting point quantity. This means there are still reporting pointbackflushes to be carried out. Going ahead and creating the goodsreceipt, however, will result in negative reporting point quantities.

System Response
As a consequence, the dependent requirements of certain components maytemporarily be insufficient. These are the components assigned to thereporting points for which reporting point backflushes are still to becarried out. The inconsistencies disappear as soon as the missingbackflushes are carried out.

Procedure
Either carry out the missing reporting point backflushes first or acceptthe temporary requirements inconsistency.