|
Diagnosis
Procedure In the material master record, in the production version, you mustenter a routing under either detailed planning (first priority) orunder rate-based planning (second priority). Milestone operations must exist in this routing. The system ususallyautomatically creates the reporting points from these milestones whencreating a product cost collector or when creating a productionversion. |