| C217 |
Translation is already blocked for the selected companies |
| C2170 |
Specify column width or select original width |
| C2171 |
Read error for function selection for &1 to &2 |
| C2172 |
Please enter either a sales order or a change number |
| C2173 |
No reservations were found for the selection criteria |
| C2174 |
Order &1: |
| C2175 |
Order &1 Sequence &2 Operation &3: |
| C2176 |
Mass processing executed - &1 log(s) created (&2) |
| C2177 |
&1 function selections generated |
| C2178 |
No change initiator selected |
| C2179 |
Sales order was not selected |
| C218 |
Data entry is already blocked for the selected companies |
| C2180 |
Change number was not selected |
| C2181 |
No procurement element was selected |
| C2182 |
Production order was not selected |
| C2183 |
Planned order was not selected |
| C2184 |
Purchase was not selected |
| C2185 |
No ikons found that match the preselection |
| C2186 |
Selection profile & does not exist |
| C2187 |
No function selected for mass processing |
| C2188 |
Initiating object record &1 is locked by user &2 |
| C2189 |
Procurement element change record &1 is locked by user &2 |
| C219 |
Company &: The program RGCCHP00 must be executed. |
| C2190 |
Initiating object record &1 is locked by user &2 |
| C2191 |
No change profile could be determined for order & |
| C2192 |
Procurement element change record &1 is locked by user &2 |
| C2193 |
There is no simulation order for production order & |
| C2194 |
Status selection profile for order & not valid |
| C2195 |
Error or warning occurred during master data transfer (see log) |
| C2196 |
Mass processing in background triggered |
| C2197 |
Material & is configured in the sales order |
| C2198 |
WM staging has been carried out for component & |
| C2199 |
Reference order & is part of a configurable collective order |
| C220 |
Company &: The validation check is not yet okay |
| C2200 |
Not all selected fields can be displayed |
| C2201 |
Collective order (assembly orders) not completely read |
| C2202 |
BOM assignment program executed - see log |
| C2203 |
The log in the BOM assignment program contains no entries |
| C2204 |
Component &1 (pos. &2) has no requirements date |
| C2205 |
Enter plant, MRP area or planning plant |
| C2206 |
Serial numbers cannot be mantained |
| C2207 |
Split order &1 cannot be archived |
| C2208 |
Select document link |
| C2209 |
Select sort column |
| C221 |
Company &: The currency translation has not been performed |
| C2210 |
New document links: &1 |
| C2211 |
No relevant documents were found |
| C2212 |
&1 deletion flag(s) are being set |
| C2213 |
&1 deletion indicators are being set |
| C2214 |
Deletion flag for order &1 can be set |
| C2215 |
Deletion indicator in order &1 can be activated |
| C2216 |
Order being processed: &1 |
| C2217 |
Document links to alternative sequences are not possible |
| C2218 |
Document version &1 for date &2 not valid (current version: &3) |
| C2219 |
No valid version exists for the document |
| C222 |
Company &: Data entry has not been blocked yet |
| C2220 |
Function cannot be executed for order & |
| C2221 |
Configuration for material & is inconsistent |
| C2222 |
Characteristic change for material & does not lead to a new BOM explosion |
| C2223 |
A valid bill of material could not be found for material &1 |
| C2224 |
The reference operation set & you selected is not valid |
| C2225 |
Settlement rule cannot be copied |
| C2226 |
Backflush indicator cannot be set for material &1 |
| C2227 |
No check because material &1 (item &2) exists at the suppliers |
| C2228 |
No availability check for components without a material number |
| C2229 |
Table &1/&2 unknown in the active archive. May not have been archived |
| C223 |
You can not block activity before currency translation |
| C2230 |
Settlement rule cannot be created with settlement profile & |
| C2231 |
Storage location &1 could not be adopted for material &2 |
| C2232 |
A valid bill of material could not be found for material &1 |
| C2233 |
The configuration is inconsistent: Display is not possible. |
| C2234 |
Change to the WBS element. Components are adjusted |
| C2235 |
Procurement element change records still exist for order &1 |
| C2236 |
Leading order &1 has a procurement element change record |
| C2237 |
Order &1 has the status "Change forbidden" |
| C2238 |
Order &1 still contains plus and minus components for a change process |
| C2239 |
Order &1 still contains plus/minus transactions for a change process |
| C224 |
Processing not possible; argument not in G/L Company Ledger table |
| C2240 |
Enter a distribution rule for &1 |
| C2241 |
Component &1 with backflush indicator cannot be reassigned |
| C2242 |
BOM for planned order &1 not valid for orders |
| C2243 |
No active archive information structure for &. Is read without structure |
| C2244 |
Order & created by order split. |
| C2245 |
Quality notification &2 still exists for order &1 |
| C2246 |
Goods receipt taking place => Settlement rule cannot be changed |
| C2247 |
Settlement rule cannot be changed as is already being used |
| C2248 |
Change settlement rule, as automatic change is not possible |
| C2249 |
Residence time 2 for order &1 (order type &2) has not yet expired |
| C2250 |
Error as stock/reqmts situation was being read: Material & ignored |
| C2251 |
Sales order/item &1/&2 does not exist (see long text) |
| C2252 |
Batch &1 was deleted from split record for material &2 (see long text) |
| C2253 |
Charge was changed, check availability for material &1 |
| C2254 |
The routing selection was ended manually |
| C2255 |
The BOM selection was ended manually |
| C2256 |
Planned order &1 cannot be converted - order network incomplete |
| C2257 |
Material &1 is not copied due to mat.status &2 (&3) |
| C2258 |
No check for advance procurement and leg (item &1, material &2) |
| C2259 |
Order &1 not found, may have been deleted by parallel run |
| C226 |
A program error occurred in status management |
| C2260 |
Operation &1 for order &2 sequence &3 has dependent objects |