| RU229 |
You do not have the authorization for MRP group & in plant & |
| RU230 |
Actual/remaining work and degree of processing inconsistent |
| RU231 |
Final confirmation exists for network & |
| RU232 |
Network & has been confirmed at header level |
| RU233 |
Network & has been confirmed at activity level |
| RU234 |
Pool & does not exist |
| RU235 |
List does not contain selected confirmatios |
| RU236 |
&1 list entries were saved as pool &2 |
| RU237 |
Pool & has been deleted |
| RU238 |
Operation & cannot be confirmed |
| RU239 |
The new or changed confirmation was copied |
| RU240 |
The cancelled confirmation was copied |
| RU241 |
Pool & already exists |
| RU242 |
Confirmation pool &1 is already being processed by &2 |
| RU243 |
The pool of confirmations & cannot be locked |
| RU244 |
There are no entries in the confirmation pool |
| RU245 |
Select at least one confirmation line |
| RU246 |
Enter remaining activity or indicator FINISHED |
| RU247 |
Enter either remaining work or set the final confirmation indicator |
| RU248 |
Enter either degree of processing or set the final confirmation indicator |
| RU249 |
Check degree of processing and remaining work. |
| RU250 |
Actual work + remaining work exceeds planned work |
| RU251 |
Actual duration + remaining duration exceeds planned duration |
| RU252 |
Enter a unit of dimension TIME |
| RU253 |
You should enter a personnel number to call up time leveling |
| RU254 |
100% of planned time already recorded - please check |
| RU255 |
No incorrect confirmations were found |
| RU256 |
Default values for user & deleted |
| RU257 |
Default values for user & changed |
| RU258 |
Default values for user & created |
| RU259 |
Default values for user & set |
| RU260 |
No user-dependent default values exist |
| RU261 |
Select a line with the personnel number |
| RU262 |
Select a line with a work center |
| RU263 |
Place the cursor on a field in the list |
| RU264 |
Internal error when sorting |
| RU265 |
You have not selected any columns yet |
| RU266 |
Capacity category and split number must be maintained together |
| RU267 |
Enter execute start and execute finish |
| RU268 |
No record was found for selection |
| RU269 |
& & & already in list - check remaining work |
| RU270 |
Formula &1 for calculating work contains division by zero! |
| RU271 |
No confirmation that could be processed was found for network & |
| RU272 |
Goods movements are redetermined because of status change |
| RU273 |
Confirmation cancelled, goods movement: &, incorrect: & |
| RU274 |
Please enter either actual start and actual finish or none of the fields |
| RU275 |
Phase/operation & secondary resource & in process order & does not exist |
| RU276 |
Phase/operation & in process order & does not exist (please check entry) |
| RU277 |
No error can be displayed for line selected |
| RU278 |
All incorrect confirmations in the system will be read |
| RU279 |
Select at least one confirmation |
| RU280 |
Select one confirmation only |
| RU281 |
At least one confirmation was not checked |
| RU282 |
Changes cannot be transferred |
| RU283 |
Operation &1 in order &2 does not exist |
| RU284 |
Operation &1 suboperation &2 in order &3 do not exist |
| RU285 |
Order cannot be displayed |
| RU286 |
&1 confirmations can be saved without errors |
| RU287 |
No remaining duration/forecast finish possible for final confirmation |
| RU288 |
Confirmation only possible after saving |
| RU289 |
Goods movements retermined because of date change |
| RU290 |
Activity type missing - confirmation will be saved without actual costs |
| RU291 |
You are not authorized to carry out mass cancellation of confirmations |
| RU292 |
Forecast work of operation exceeds maximum work |
| RU293 |
Actual work exceeds maximum work |
| RU294 |
Remaining work exceeds maximum work |
| RU299 |
************************** PM - Order ******************************** |
| RU300 |
Controlling area of work center (&) differs from order (&) |
| RU301 |
The cursor should not be on an empty line |
| RU302 |
Enter a plant for the work center |
| RU303 |
Only &2 decimal places are permitted for unit of measure &1 |
| RU304 |
Select a line in the data entry section |
| RU305 |
On entering a techn. object the other entries are ignored |
| RU306 |
No standing order could be calculated for a techn. object |
| RU307 |
No standing order was selected |
| RU308 |
Select a line with the standing order |
| RU309 |
No standing order is assigned to the functional location |
| RU310 |
No standing order is assigned to equipment & |
| RU311 |
Value help activity type: Enter plant, work center, posting date |
| RU312 |
Actual or planned work center is adopted from operation/operation element |
| RU313 |
Activity type filled - maintain workplace also |
| RU314 |
Service type copied from work center |
| RU400 |
************************P D C - A N A L Y S I S************************** |
| RU401 |
There are no subsystem confirmations |
| RU402 |
Record type & is not supported |
| RU403 |
The time event was already reported |
| RU404 |
Error when deleting confirmations from table RUECK, RC = & |
| RU405 |
No authorization for HR pair formation |
| RU406 |
Pair formation: Conflict with subsequent confirmation |
| RU407 |
Pair formation: Conflict with previous confirmation |
| RU408 |
Pair formation: Start confirmation is missing |
| RU409 |
Time determination: Work center & does not exist in plant & |
| RU410 |
Time determination: Capacity type & not defined for work center & |
| RU411 |
Actual time determination: SI unit is missing |
| RU412 |
Processing mode & is not supported |
| RU413 |
Error when reading order data (CO_RU_CONFIRMATION_PREPARE) |
| RU414 |
Error when checking confirmation data (CO_RU_CONFIRMATION_CHECK) |
| RU415 |
Error in number assignment for number range object PD_SEQ_NR |
| RU416 |
Error in HR plausibility check (HR_EVENT_CHECK) |
| RU417 |
Error when creating document records (CO_RU_CONFIRMATION_ADD) |