Id | Title |
---|---|
RU229 | You do not have the authorization for MRP group & in plant & |
RU230 | Actual/remaining work and degree of processing inconsistent |
RU231 | Final confirmation exists for network & |
RU232 | Network & has been confirmed at header level |
RU233 | Network & has been confirmed at activity level |
RU234 | Pool & does not exist |
RU235 | List does not contain selected confirmatios |
RU236 | &1 list entries were saved as pool &2 |
RU237 | Pool & has been deleted |
RU238 | Operation & cannot be confirmed |
RU239 | The new or changed confirmation was copied |
RU240 | The cancelled confirmation was copied |
RU241 | Pool & already exists |
RU242 | Confirmation pool &1 is already being processed by &2 |
RU243 | The pool of confirmations & cannot be locked |
RU244 | There are no entries in the confirmation pool |
RU245 | Select at least one confirmation line |
RU246 | Enter remaining activity or indicator FINISHED |
RU247 | Enter either remaining work or set the final confirmation indicator |
RU248 | Enter either degree of processing or set the final confirmation indicator |
RU249 | Check degree of processing and remaining work. |
RU250 | Actual work + remaining work exceeds planned work |
RU251 | Actual duration + remaining duration exceeds planned duration |
RU252 | Enter a unit of dimension TIME |
RU253 | You should enter a personnel number to call up time leveling |
RU254 | 100% of planned time already recorded - please check |
RU255 | No incorrect confirmations were found |
RU256 | Default values for user & deleted |
RU257 | Default values for user & changed |
RU258 | Default values for user & created |
RU259 | Default values for user & set |
RU260 | No user-dependent default values exist |
RU261 | Select a line with the personnel number |
RU262 | Select a line with a work center |
RU263 | Place the cursor on a field in the list |
RU264 | Internal error when sorting |
RU265 | You have not selected any columns yet |
RU266 | Capacity category and split number must be maintained together |
RU267 | Enter execute start and execute finish |
RU268 | No record was found for selection |
RU269 | & & & already in list - check remaining work |
RU270 | Formula &1 for calculating work contains division by zero! |
RU271 | No confirmation that could be processed was found for network & |
RU272 | Goods movements are redetermined because of status change |
RU273 | Confirmation cancelled, goods movement: &, incorrect: & |
RU274 | Please enter either actual start and actual finish or none of the fields |
RU275 | Phase/operation & secondary resource & in process order & does not exist |
RU276 | Phase/operation & in process order & does not exist (please check entry) |
RU277 | No error can be displayed for line selected |
RU278 | All incorrect confirmations in the system will be read |
RU279 | Select at least one confirmation |
RU280 | Select one confirmation only |
RU281 | At least one confirmation was not checked |
RU282 | Changes cannot be transferred |
RU283 | Operation &1 in order &2 does not exist |
RU284 | Operation &1 suboperation &2 in order &3 do not exist |
RU285 | Order cannot be displayed |
RU286 | &1 confirmations can be saved without errors |
RU287 | No remaining duration/forecast finish possible for final confirmation |
RU288 | Confirmation only possible after saving |
RU289 | Goods movements retermined because of date change |
RU290 | Activity type missing - confirmation will be saved without actual costs |
RU291 | You are not authorized to carry out mass cancellation of confirmations |
RU292 | Forecast work of operation exceeds maximum work |
RU293 | Actual work exceeds maximum work |
RU294 | Remaining work exceeds maximum work |
RU299 | ************************** PM - Order ******************************** |
RU300 | Controlling area of work center (&) differs from order (&) |
RU301 | The cursor should not be on an empty line |
RU302 | Enter a plant for the work center |
RU303 | Only &2 decimal places are permitted for unit of measure &1 |
RU304 | Select a line in the data entry section |
RU305 | On entering a techn. object the other entries are ignored |
RU306 | No standing order could be calculated for a techn. object |
RU307 | No standing order was selected |
RU308 | Select a line with the standing order |
RU309 | No standing order is assigned to the functional location |
RU310 | No standing order is assigned to equipment & |
RU311 | Value help activity type: Enter plant, work center, posting date |
RU312 | Actual or planned work center is adopted from operation/operation element |
RU313 | Activity type filled - maintain workplace also |
RU314 | Service type copied from work center |
RU400 | ************************P D C - A N A L Y S I S************************** |
RU401 | There are no subsystem confirmations |
RU402 | Record type & is not supported |
RU403 | The time event was already reported |
RU404 | Error when deleting confirmations from table RUECK, RC = & |
RU405 | No authorization for HR pair formation |
RU406 | Pair formation: Conflict with subsequent confirmation |
RU407 | Pair formation: Conflict with previous confirmation |
RU408 | Pair formation: Start confirmation is missing |
RU409 | Time determination: Work center & does not exist in plant & |
RU410 | Time determination: Capacity type & not defined for work center & |
RU411 | Actual time determination: SI unit is missing |
RU412 | Processing mode & is not supported |
RU413 | Error when reading order data (CO_RU_CONFIRMATION_PREPARE) |
RU414 | Error when checking confirmation data (CO_RU_CONFIRMATION_CHECK) |
RU415 | Error in number assignment for number range object PD_SEQ_NR |
RU416 | Error in HR plausibility check (HR_EVENT_CHECK) |
RU417 | Error when creating document records (CO_RU_CONFIRMATION_ADD) |