| RM130 |
Please enter material and/or planned order |
| RM131 |
Planned order & is a planned order for preplanning |
| RM132 |
Planned order & is only allowed for make-to-order production |
| RM133 |
Planned order & only allowed for Kanban procedures |
| RM134 |
Planned order & only allowed for long-term planning |
| RM135 |
Planned order & does not exist |
| RM136 |
No planned orders exist for the selection criteria |
| RM137 |
Enter either material or production version for selection |
| RM138 |
No planned orders exist for sales order & and item & |
| RM139 |
Error creating the planned order |
| RM140 |
No preliminary costing possible with nonvaluated make-to-order production |
| RM141 |
Max. 98 production versions are allowed for costing per prod. version |
| RM142 |
Error inserting the link between prod.version and cost estimate |
| RM143 |
No planned orders exist for production lot & |
| RM144 |
No sales orders were found for material &1 |
| RM145 |
Product cost collector & & & cannot be determined specifically |
| RM146 |
No version exists in planned order &1. |
| RM147 |
No sales order was selected |
| RM148 |
REM not allowed for plant/material/version &1/&2/&3 |
| RM149 |
Production version not found |
| RM150 |
Production version not found for selection criteria & & & & |
| RM151 |
Production version cannot be specifically identified |
| RM152 |
Planned order cannot be specifically identified |
| RM153 |
The system could not find the planned order you entered |
| RM154 |
Cost estimate for product cost collector &1 was not successful |
| RM155 |
No item has been selected |
| RM156 |
Invalid combination of version and planned order |
| RM157 |
Invalid combination of material and planned order |
| RM158 |
Invalid combination of plant and planned order |
| RM159 |
Invalid combination of planning plant and planned order |
| RM160 |
Revision level not found |
| RM161 |
Invalid combination of material and production lot |
| RM162 |
Invalid combination of plant and production lot |
| RM163 |
The material you entered does not exist in the sales order |
| RM164 |
The sales order does not exist in the plant you entered |
| RM165 |
No authorization for: &1 in plant &2 |
| RM166 |
Run schedule header & is blocked by another user |
| RM167 |
System locking error |
| RM168 |
Sales order &2 is blocked by user &1 |
| RM169 |
Production version &1 for material &2 in plant &3 is locked |
| RM170 |
No material components exist |
| RM171 |
Please enter sales order number and item for the selection |
| RM172 |
Invalid combination of plant and run schedule header |
| RM173 |
A maximum of six activities allowed |
| RM174 |
You must enter activities |
| RM175 |
Existing standard cost estimate cannot be used |
| RM176 |
Excess when converting to unit of measure in routing header |
| RM177 |
Specify entry qty of material with serial no. reqmt. w/o decimal places |
| RM178 |
Please use the unit of entry of the reporting point |
| RM179 |
Enter either the confirmation quantity or the scrap quantity |
| RM180 |
Please enter a quantity to be confirmed or a scrap quantity |
| RM181 |
Error converting the creation unit of measure |
| RM182 |
Reason for scrap deleted |
| RM183 |
Account assignment object is blocked by user &1 |
| RM184 |
Actual-data entry will be posted (No material document will be generated) |
| RM185 |
Enter the to storage location or maintain default values |
| RM186 |
Activities posted |
| RM187 |
GR with document & posted |
| RM188 |
GR and GI with document & posted |
| RM189 |
GR and partial GI with document & posted |
| RM190 |
GR with document & and activities posted |
| RM191 |
GR and GI with document & and activities posted |
| RM192 |
GR and partial GI with document & and activities posted |
| RM193 |
GI with document & posted |
| RM194 |
Partial GI with document & posted |
| RM195 |
Material movement with document & reversed |
| RM196 |
Material movement with document & and activity posting reversed |
| RM197 |
Backlogs from backflush were created, changed, or deleted |
| RM198 |
Backlogs from backflush were created or changed |
| RM199 |
Discrepancies from backflush remain unchanged |
| RM200 |
Please enter a production line |
| RM201 |
Please enter a planning ID |
| RM202 |
Please enter either the production line or the planning ID |
| RM203 |
No materials with missing quantities exist |
| RM204 |
No PAUF overdelivery possible if goods issue posting is decoupled |
| RM206 |
Run schedule headers with no production lines/Pl-IDs found |
| RM207 |
All reporting points found without confirmation |
| RM208 |
No reporting point found that suits the selection |
| RM210 |
Reversal - material documents cannot be reversed |
| RM211 |
Collective postprocessing NOT carried out successfully for all items |
| RM212 |
Collective entry of act. data NOT carried out successfully for all items |
| RM213 |
Document is postprocessing document and cannot be cancelled |
| RM214 |
Postprocessing for material &1 with version &2 was terminated |
| RM215 |
GI posted with document & and activities |
| RM216 |
Partial GI posted with document & and activities |
| RM217 |
Activity posting cancelled |
| RM218 |
Neither material movement nor activity posting was reversed |
| RM219 |
Collective postprocessing carried out for all items |
| RM220 |
Collective entry of actual data carried out for all items |
| RM221 |
Entry of actual data for material &1 with version &2 faulty |
| RM222 |
Entry of actual data carried out for material & with version & |
| RM223 |
For mat. & with version &, entry of actual data for rep. point & faulty |
| RM224 |
For mat. & with version &, entry of actual data carried out for RP & |
| RM225 |
For mat. & with verison &, reporting point & reduced incorrectly |
| RM226 |
For mat. & with version &, reporting point & reduced |
| RM227 |
Postprocessing for material &1 with version &2 was not successful |
| RM228 |
Phantom assembly & must not be bulk material |
| RM229 |
Correction delivery being generated |
| RM230 |
Postprocessing records exist for confirmation that is to be cancelled |
| RM231 |
Sales order & / & does not exist |