SAP Message RM176 - Excess when converting to unit of measure in routing header

Diagnosis
In the reporting point backflush, the entered unit of measure for thebackflush quantity is converted to the routing header unit of measure.

System Response
In this process, the conversion result exceeded the maximum valueallowed.

Procedure
Carry out the backflush using a smaller quantity.