Id | Title |
---|---|
C5516 | Plant & already allocated to recipe group & |
C5517 | No recipe found for &. Enter a valid one. |
C5518 | Task list type not allowed for master recipes |
C5519 | No master recipe specified |
C5520 | BOM data is incomplete |
C5521 | Recipe does not exist; display not possible |
C5549 | - |
C5550 | Secondary resources |
C5551 | Enter number for secondary resource |
C5552 | Select a secondary resource |
C5553 | You have reached the first secondary resource selected |
C5554 | You have reached the last secondary resource selected |
C5555 | Select another secondary resource number, this one already exists |
C5600 | Material allocation |
C5601 | Task list type & not allowed |
C5602 | This assignment of material to recipe already exists |
C5603 | No production versions exist for material $ $ |
C5604 | Enter a new production version, & does not exist |
C5605 | Enter a recipe |
C5606 | Select a valid production version for the recipe |
C5607 | Enter a new production version, & already exists |
C5608 | You cannot branch to another material list |
C5609 | No valid BOM exists for material & plant & |
C5610 | The material does not exist for & & & |
C5611 | This BOM alternative does not exist. It will be created |
C5612 | Date of production version does not match BOM alternative |
C5613 | Lot size of production version does not match BOM alternative |
C5614 | Check BOM alternative proposal |
C5615 | The "from" lot size must not exceed the "to" lot size |
C5616 | The "to" date is in the past |
C5617 | Run schedule headers with a different validity exist for production vers. |
C5618 | BOM alternative is used in a different master recipe |
C5619 | No production version exists |
C5620 | You cannot convert the charge quantity unit to the material quantity unit |
C5621 | Production version & uses the BOM & in recipe & & |
C5622 | Material & & is not allocated to master recipe & & |
C5623 | Production version & has not been maintained for material and recipe |
C5624 | Default rule & not allowed |
C5625 | Production version & for the recipe does not have a BOM alternative |
C5626 | Material master &2 &3 is locked by user &1 |
C5627 | Recipe & does not exist. Enter an existing recipe |
C5628 | You do not have authorization to edit the production version |
C5629 | Production versions still exist |
C5630 | Changes may have been made. Checks may not be current - Save entries |
C5631 | Existing production versions are not deleted |
C5632 | Detailed plan &1 &2 requires approval |
C5633 | No material/recipe allocation found |
C5634 | If product cost collector active, choose default rule f. period.settlemnt |
C5635 | Always enter a material and a plant for the production version |
C5636 | The production version you specified does not exist |
C5637 | Selection parameters are taken over from production version |
C5638 | The production version is not valid for the key date |
C5639 | Task list or BOM missing in production version |
C5640 | -----------------------Material quantity calculation-------------------- |
C5641 | Scheduling without component quantities |
C5642 | BOM is missing in production version |
C5643 | Formula results in quantity of zero; results are not transferred to BOM |
C5644 | You are not authorized to create the assignment |
C5645 | Error occurred when exploding BOM in &1 in master recipe &2 |
C5650 | Recipe header |
C5651 | Long text for recipe & cannot be copied |
C5652 | Recipe group & is being processed by user & |
C5653 | Select a recipe |
C5654 | List does not show any recipes |
C5655 | You have reached the last recipe selected |
C5656 | You have reached the first recipe selected |
C5657 | Select another description for recipe, this one already exists |
C5658 | Recipes exist in the past or in the future |
C5659 | Recipe deleted |
C5660 | You do not have authorization to delete this recipe |
C5661 | Enter a resource network |
C5662 | Changes can only be made with a change number |
C5663 | Changes can only be made with a corresponding engineering change order |
C5664 | Changes can only be made with a corr. engineering change order and type |
C5665 | Enter a change type for change rule & |
C5666 | You cannot change task list/recipe & because of change rule & |
C5667 | Not all recipes are displayed due to missing display authorization |
C5668 | No data displayed as you do not have the required display authorization |
C5669 | Deletion flag is valid for all change statuses of the recipe |
C5699 | - |
C5700 | Operations |
C5701 | Data for class type & has not been converted yet |
C5702 | Resource & is marked for deletion |
C5703 | Resource & is locked |
C5704 | For operations, choose control key without external processing |
C5705 | Resource & does not exist in plant &. Operation & was copied w/o resource |
C5706 | Control recipe destination & does not exist in plant & (phase &) |
C5707 | Subordinate phases will also be deleted when you delete operations |
C5708 | Res. & does not exist in plant &. Sec.res. for op. & was copied w/o res. |
C5709 | Materials is available in the material list more than once |
C5749 | - |
C5750 | Phases |
C5751 | Select an operation |
C5752 | You have reached the first operation selected |
C5753 | You have reached the last operation selected |
C5754 | Place the cursor on a line containing a phase |
C5755 | You can only select created records |
C5756 | Enter a phase |
C5757 | Enter a control recipe destination for phase & |
C5758 | Select another phase number, this one exists |