| C5516 |
Plant & already allocated to recipe group & |
| C5517 |
No recipe found for &. Enter a valid one. |
| C5518 |
Task list type not allowed for master recipes |
| C5519 |
No master recipe specified |
| C5520 |
BOM data is incomplete |
| C5521 |
Recipe does not exist; display not possible |
| C5549 |
- |
| C5550 |
Secondary resources |
| C5551 |
Enter number for secondary resource |
| C5552 |
Select a secondary resource |
| C5553 |
You have reached the first secondary resource selected |
| C5554 |
You have reached the last secondary resource selected |
| C5555 |
Select another secondary resource number, this one already exists |
| C5600 |
Material allocation |
| C5601 |
Task list type & not allowed |
| C5602 |
This assignment of material to recipe already exists |
| C5603 |
No production versions exist for material $ $ |
| C5604 |
Enter a new production version, & does not exist |
| C5605 |
Enter a recipe |
| C5606 |
Select a valid production version for the recipe |
| C5607 |
Enter a new production version, & already exists |
| C5608 |
You cannot branch to another material list |
| C5609 |
No valid BOM exists for material & plant & |
| C5610 |
The material does not exist for & & & |
| C5611 |
This BOM alternative does not exist. It will be created |
| C5612 |
Date of production version does not match BOM alternative |
| C5613 |
Lot size of production version does not match BOM alternative |
| C5614 |
Check BOM alternative proposal |
| C5615 |
The "from" lot size must not exceed the "to" lot size |
| C5616 |
The "to" date is in the past |
| C5617 |
Run schedule headers with a different validity exist for production vers. |
| C5618 |
BOM alternative is used in a different master recipe |
| C5619 |
No production version exists |
| C5620 |
You cannot convert the charge quantity unit to the material quantity unit |
| C5621 |
Production version & uses the BOM & in recipe & & |
| C5622 |
Material & & is not allocated to master recipe & & |
| C5623 |
Production version & has not been maintained for material and recipe |
| C5624 |
Default rule & not allowed |
| C5625 |
Production version & for the recipe does not have a BOM alternative |
| C5626 |
Material master &2 &3 is locked by user &1 |
| C5627 |
Recipe & does not exist. Enter an existing recipe |
| C5628 |
You do not have authorization to edit the production version |
| C5629 |
Production versions still exist |
| C5630 |
Changes may have been made. Checks may not be current - Save entries |
| C5631 |
Existing production versions are not deleted |
| C5632 |
Detailed plan &1 &2 requires approval |
| C5633 |
No material/recipe allocation found |
| C5634 |
If product cost collector active, choose default rule f. period.settlemnt |
| C5635 |
Always enter a material and a plant for the production version |
| C5636 |
The production version you specified does not exist |
| C5637 |
Selection parameters are taken over from production version |
| C5638 |
The production version is not valid for the key date |
| C5639 |
Task list or BOM missing in production version |
| C5640 |
-----------------------Material quantity calculation-------------------- |
| C5641 |
Scheduling without component quantities |
| C5642 |
BOM is missing in production version |
| C5643 |
Formula results in quantity of zero; results are not transferred to BOM |
| C5644 |
You are not authorized to create the assignment |
| C5645 |
Error occurred when exploding BOM in &1 in master recipe &2 |
| C5650 |
Recipe header |
| C5651 |
Long text for recipe & cannot be copied |
| C5652 |
Recipe group & is being processed by user & |
| C5653 |
Select a recipe |
| C5654 |
List does not show any recipes |
| C5655 |
You have reached the last recipe selected |
| C5656 |
You have reached the first recipe selected |
| C5657 |
Select another description for recipe, this one already exists |
| C5658 |
Recipes exist in the past or in the future |
| C5659 |
Recipe deleted |
| C5660 |
You do not have authorization to delete this recipe |
| C5661 |
Enter a resource network |
| C5662 |
Changes can only be made with a change number |
| C5663 |
Changes can only be made with a corresponding engineering change order |
| C5664 |
Changes can only be made with a corr. engineering change order and type |
| C5665 |
Enter a change type for change rule & |
| C5666 |
You cannot change task list/recipe & because of change rule & |
| C5667 |
Not all recipes are displayed due to missing display authorization |
| C5668 |
No data displayed as you do not have the required display authorization |
| C5669 |
Deletion flag is valid for all change statuses of the recipe |
| C5699 |
- |
| C5700 |
Operations |
| C5701 |
Data for class type & has not been converted yet |
| C5702 |
Resource & is marked for deletion |
| C5703 |
Resource & is locked |
| C5704 |
For operations, choose control key without external processing |
| C5705 |
Resource & does not exist in plant &. Operation & was copied w/o resource |
| C5706 |
Control recipe destination & does not exist in plant & (phase &) |
| C5707 |
Subordinate phases will also be deleted when you delete operations |
| C5708 |
Res. & does not exist in plant &. Sec.res. for op. & was copied w/o res. |
| C5709 |
Materials is available in the material list more than once |
| C5749 |
- |
| C5750 |
Phases |
| C5751 |
Select an operation |
| C5752 |
You have reached the first operation selected |
| C5753 |
You have reached the last operation selected |
| C5754 |
Place the cursor on a line containing a phase |
| C5755 |
You can only select created records |
| C5756 |
Enter a phase |
| C5757 |
Enter a control recipe destination for phase & |
| C5758 |
Select another phase number, this one exists |