| MANDT |
X |
MANDT |
CLNT |
0 |
3 |
0 |
T000 |
Client |
| DARPROF_ID |
X |
DARPROF_ID |
CHAR |
3 |
10 |
0 |
TCY08 |
ID of a user-spec. profile in the table for option profiles |
| HIEVER |
|
HIEVER |
CHAR |
13 |
1 |
0 |
|
Cumulate capacity requirements using work center hierarchy |
| HIEAUF |
|
HIEAUF |
CHAR |
14 |
1 |
0 |
|
Explode hierarchy |
| KUMUL |
|
KUMULD |
CHAR |
15 |
1 |
0 |
|
Indicator, whether cumulated display is desired |
| MINBEL |
|
MINBELA |
DEC |
16 |
3 |
0 |
|
Minimum load that will be displayed |
| MAXBEL |
|
MAXBELA |
DEC |
18 |
3 |
0 |
|
Maximum load that will be displayed |
| RUECKDAT |
|
RDATUM_CNT |
DEC |
20 |
5 |
0 |
|
Offset (in days) of dispatch date for backlog to curr. date |
| PEINHEIT |
|
DAPER |
CHAR |
23 |
1 |
0 |
|
Unit in which the period duration is specified (day, week..) |
| PDAUER |
|
DAPED |
DEC |
24 |
3 |
0 |
|
Duration of a period (units as specified in period type) |
| LIBART |
|
CY_SBART |
CHAR |
26 |
1 |
0 |
|
Requirements category (scheduled or remaining) |
| ZAPER |
|
CY_ZAPER |
CHAR |
27 |
1 |
0 |
|
Type of date specification |
| LIDAVCNT |
|
CY_DCNTV |
DEC |
28 |
5 |
0 |
|
Offset (in days) of start date for lists to current date |
| LIDABCNT |
|
CY_DCNTB |
DEC |
31 |
5 |
0 |
|
Offset (in days) of end date for lists to current date |
| LIEINH |
|
CY_KEINH |
UNIT |
34 |
3 |
0 |
T006 |
Unit of of measure for displaying capacity requirements |
| DAVAP |
|
DAVAP |
CHAR |
37 |
1 |
0 |
|
Distribution according to key in work center or operation |
| HNAME |
|
CR_HNAME |
CHAR |
38 |
10 |
0 |
|
Name of hierarchy |
| HWERKS |
|
WERKS_D |
CHAR |
48 |
4 |
0 |
T001W |
Plant |
| VERTL1 |
|
CR_VERTL |
CHAR |
52 |
8 |
0 |
TC29 |
Distribution of capacity requirements (Planned/prod.order) |
| VERTLN |
|
CR_VERTLN |
CHAR |
60 |
8 |
0 |
TC29 |
Distr.cap.reqmts (plant maint.,process order, network) |
| POOLKAP |
|
CY_POOLKAP |
CHAR |
68 |
1 |
0 |
|
Indicator: Cumulated view of the rqmts of pooled capacity |
| TT_FAUFT |
|
CY_TTFAUFT |
CHAR |
69 |
1 |
0 |
|
Indicator: Branch to production order - change or display |
| TT_PAUFT |
|
CY_TTPAUFT |
CHAR |
70 |
1 |
0 |
|
Indicator: Branch to planned order display or maintenance |
| TT_ARBPL |
|
CY_TTARBPL |
CHAR |
71 |
1 |
0 |
|
Switch: Branch to work center - change or display |
| ANVER |
|
CY_ANVER |
CHAR |
72 |
1 |
0 |
|
Cumulate available capacity using work center hierarchy |
| DATEFROM |
|
CY_DATEF |
CHAR |
73 |
10 |
0 |
|
Start date for output of capacity evaluations |
| DATETO |
|
CY_DATET |
CHAR |
83 |
10 |
0 |
|
Finish date for output of capacity evaluations |
| RDATE_TYPE |
|
CY_RDATETY |
CHAR |
93 |
1 |
0 |
|
Type of date specification |
| RDATE |
|
CY_RDATE |
CHAR |
94 |
10 |
0 |
|
Date of backlog dispatching |
| MRPP |
|
MRPPP |
CHAR |
104 |
3 |
0 |
|
PPC planning calendar |
| UNITSOURCE |
|
CY_UNITSRC |
CHAR |
107 |
1 |
0 |
|
Origin of unit of measure for available cap. and cap.reqmts |
| PPSWERK |
|
WERKS_D |
CHAR |
108 |
4 |
0 |
T001W |
Plant |