| 668311 | VL10: Deliveries with quantity 0 due to material block |
| 304616 | Availability overview does not show own sales order |
| 133889 | Over-confirmation for batch split |
| 71173 | ATP collective availability check with quantity block |
| 84938 | VL04 - negative ATP qty during batch determination |
| 107895 | CO40: Accumulation type 3 for conversion planned order |
| 326320 | Component ovw.: incorrect call availability check |
| 858633 | Confirmed quantity 0 in sales order (parallel processes) |
| 1081805 | APO integration incorrect with R/3 summarized requirements |
| 101254 | Enhancement to shipping point determination |
| 547512 | FAQ: Customizing of the ATP in R/3 |
| 549064 | FAQ: Rescheduling and backorder updating in R/3 |
| 123500 | Controlling the results of the availability check |
| 201613 | ATP Over-confirmation in batch determination |
| 767372 | Confirmed quantity 0 in sales order (IDoc) |
| 153355 | No availability owing to negative ATP quantity |
| 133561 | Deactivate availability check for performance reas. |
| 907053 | Analysis report for missing reqmts due to initial SUMBD |
| 321803 | Explanatory notes on the ATP Customizing |
| 799948 | FAQ: Dynamic assembly |
| 547118 | FAQ: Result of ATP calculation |