| Related Notes | |
| 715192 | Determination of BOM Usage when exploding BOM |
| 814644 | 351451:MRP selects order BOM with incorrect use |
| 933922 | Short dump when converting planned order to production order |
| 708487 | MRP uses order BOM with incorrect usage |
| 338148 | MRP generates WBS BOMs with incorrect BOM usage |
| 411618 | MRP explodes material BOM instead of WBS BOM |
| 28306 | Selection of the alternative BOM in production order |
| 415981 | MRP explodes old status of the work breakdown structure BOM |
| 138789 | BOM explosion with different usages |