| 789390 | Material forecast: Error ORA-01555 for background forecast |
| 604589 | Material forecast: Version management in background |
| 519317 | Material forecast: Threshold value for rounding |
| 502897 | Forecast: Rounding strategy in Transaction MM02 and MPxx |
| 813294 | Material forecast: Rounding of the forecast values |
| 693126 | Batch forecasting results in errorenous data |
| 90892 | Forecast: supplement f.model selection procedure 2 |
| 170023 | Mat. forecast(MP38,MPBT):Performance improvement |
| 89097 | Materl forecast: 'Write-protected' flds in profile |
| 149470 | Material forecast: wrong seasonal indexes w/o initialization |
| 393320 | Advice: Threshold value for rounding in material forecast |
| 183779 | Matl forecst:Incor.modl selctd f.modl sel.procdre 2 |
| 137807 | Performance MP38/MPBT: Material forecast |
| 75853 | Initialization indicator is not overwritten |
| 85692 | Mat.forecast: Optimization indicator write protctd |
| 699137 | Forecast: MAD calculated incorrectly |
| 614769 | Forecast: Short dump COMPUTE_BCD_OVERFLOW |
| 733442 | Forecast: Short dump COMPUTE_FLOAT_ZERODIVIDE |
| 76688 | Material forecast: Model selection procedure 2 |
| 453361 | CS total forecast terminates due to COMMIT WORK. |
| 454700 | CS background forecast terminates due to DB error ORA-01555. |
| 932258 | Forecast: Problem in the parameter optimization |
| 719900 | Forecast: Model selection procedure 2 incorrect |
| 710283 | Forecast: Short dump "CONVT_OVERFLOW" |
| 394942 | CS total forecast terminates for some materials |
| 417618 | Forecast: Maximum forecast values set too low |
| 665125 | Forecast: Parameter optimization for model selection |
| 610612 | Forecast: initialization during model selection |
| 528153 | Material forecast: Storing the rounded values |
| 88723 | Period fixing during mass material forecast |
| 84218 | Material forecast: forecast models '0' and 'N' |
| 350555 | Matl forecast:flag for specificatn of rounding cat. |
| 173281 | Matl forcast MP38,MPBT:perfrm.imprvmt when you save |
| 616176 | Material forecast: deleting inactive data records from PROW |
| 183032 | Batch forecast: Reprocessing forcst errors & exception |
| 388992 | Matl forecast:MP33 Reprocessing when changing MRP controller |
| 451587 | Follow-on note for Note 388992, mass processing |