| 161805 | AFS ME52->Goto->Statistics->Changes does not show Username |
| 757334 | ME52: Unit of measure can be changed |
| 168416 | MRP deletes partial converted purchase requisitions |
| 490900 | Authorization check with jump to Enjoy transactions |
| 383818 | ME51, ME52 and ME53 still available in the future |
| 332918 | MD04/MD05: Display/change PReq |
| 128097 | AFS Stock tansport order |
| 406712 | ME52 Vendor is not written in components |
| 801381 | V_V2: Jump to Transaction ME22 instead of ME22N |
| 104270 | Requirement in the incorrect SC MRP segment |
| 132841 | AFS Subcontracting double requirements |
| 154151 | AFS Subcontracting vendor is not set for components |
| 350975 | ME22N: BS007 when changing the purchase order quantity |
| 336552 | Performance ME21, ME22, ME59 |
| 357455 | Incorrect settlement profile after MRP run |
| 164437 | Consist. check report for PRs with AFS-material |
| 367766 | Message: Delivery date 'Ex factory' is in the past |
| 36601 | Copying text from network into PReq with > 1 item |
| 338442 | Third-party requisition/third-party PO GR flag |
| 445239 | ME56/ME57-Source Overview displays numerous OUn |
| 366985 | PREQ: Update terminatn after deletn of sched. lines |
| 326093 | Third-party PReq with creatn indicatr V is changble |
| 209318 | Round AFS values with 'Next Rounding' |
| 145539 | AFS SD document number is not in secundary requ. |
| 301596 | Sizespread in line entry |
| 191873 | Dimension Values of AFS-nogrid mat. are not cleared |
| 136267 | AFS point of consumption Vendor capacity |
| 401817 | Incorrect reduction of capacity and performance |
| 389636 | Create subcontracting PReq with nogrid header material |
| 304975 | Rounding button in Line Entry Screen |
| 173837 | Enhancement cor.report f. stock transprt requistion |
| 385681 | Performance of Capacity |
| 142287 | AFS Conversion planned order to purchase requisit. |
| 209504 | Copy PReq: Change dimension message 8J 037 |
| 134523 | ME52: PReq created from order cannot be deleted |
| 395427 | Fixed Vendor change does not change resv. for PRs |
| 82210 | Price is required entry via ME_REQUISITION_EXT |
| 210718 | Suppressing AFS SC components with quantity of zero |
| 336195 | Incorrect quantity in BOM explosion |
| 192328 | Availability check for AFS materials |
| 181897 | No size conversion during size grid entry |
| 150569 | AFS GR processing time is not considered in PReq. |
| 136379 | AFS Vendor capacity consumption |
| 216960 | Deletion of PReq AFS third-party items |
| 319154 | Component scrap is not taken into account |
| 150522 | AFS Subcontracting components are not correct |
| 322548 | /AFS/SZIN not filled after grid entry |
| 146767 | AFS SIzespread miscalculation |
| 336720 | Rounding error in BOM explosion |
| 117391 | Rel. proced. PReq:Problems after upgrade to Rel 4.0 |
| 154057 | AFS MRP selects wrong Purchorg from material master |
| 175158 | Enhancement correctn reprt f.stock transfr PREQU 2 |
| 363743 | Error message FGV002 for purchase order or PReq |
| 47815 | Subcontracting: Explosion of configured BOM |
| 156901 | AFS dependend requirement is not opened |
| 216625 | Accnt assignm. indicat. incor. in Line Entry Screen |
| 216282 | AFS rounding after implementing Note 209989 |
| 159053 | AFS Purchase requisition deletion indicator |
| 357601 | Bills of material with alternative units of measure |
| 131301 | Correction of note 125341: AFS Subcontracting |
| 140514 | Display subcontracting requirement from MRP list. |
| 73333 | Error message SG111 or SG119 |
| 851485 | Delete long text not copied into PReq |
| 154809 | ME51: Bill of material not exploded/error 61060 |
| 484467 | Changes in the PReq are not copied to maintenance order |
| 546860 | ME52/N: Texts in incorrect sequence from sales order |
| 206642 | MRP status incorrect after deletion of PO item |
| 365800 | CS:Delivery date PREQ f. deliv. group/full delivery |
| 209989 | Performance purchase order, purchase requisition |
| 416617 | Delete purchase requisition, commitments not reduced |
| 208138 | Info record necessary for cross-company transfer |
| 326232 | Incrrct grd numbr in PReq/PO (thrd-prty procss flw) |
| 176637 | AFS subcontracting PReq & POs without components |
| 382942 | Maintain BOM - grid entries are not displayed |
| 47501 | PReq selectn via req tracking number not working |
| 490688 | ME51N, ME51; ME52 short dump for PReq item w/ accnt assgnmnt |
| 328907 | MRP controller as creator of PReqs from MRP run |
| 594773 | Incorrect commitment data with change in the document chain |
| 384043 | Purchase requisition items not displayd (scrolling) |
| 606455 | Released purchase reqs are changed by requirements planning |
| 340017 | Program termination when displaying PReq statistics |
| 141782 | Display subcontracting requirement from MRP list |
| 138644 | AFS Capacity consumption overload |
| 334986 | Branch to PReq processing: ME53 vs ME53N |
| 187523 | SC: Components after new BOM explosion incorrect |
| 185733 | ME21: Size conversion - correction of Note 181897 |
| 171402 | ME21: Subcontracting with additional components |
| 638441 | Update termination during the saving of an order |
| 640175 | Message FI741 with automatic commitments carryforward |
| 324028 | Transfer of changed fields from PReq to activity |
| 408432 | Source determination: Error ME581 / ME583 |
| 508610 | Invoice parking with deleted purchase order item |
| 38073 | No PO statistics for outline agreement requisitions and text |
| 327701 | MM-PUR:Startng drum calcltn w.chngng stock category |
| 931863 | ME52N: The changes could not be completely undone II |
| 498753 | Line item comparison: deleted purchase orders listed |