| 158881 | AFS: no BOM expl. in plnd ord for NOGRID material |
| 160506 | AFS: Plnd ord qty = ? when returning from 'AFS size |
| 158628 | AFS: Plnd ord qty = ? when returning from 'AFS size |
| 155525 | AFS: Plnd ord qty = ? when returning from 'AFS size grid' |
| 641489 | R/3->APO: Unchanged planned orders sent to APO (BAPI) |
| 605282 | MD11/MD12: Components' requirement dates |
| 85583 | MD12: Deleting planned order |
| 149363 | Genratng plannd ordr w/o AFS grid info/plannd order |
| 743575 | R/3->APO: Unchanged planned orders sent to APO |
| 126723 | ECR: Too many components in planned order |
| 338715 | Order with zero duration: basic dates incorrect |
| 442419 | Underconfirmation for conversion of pl. ord. -> prod. order |
| 397515 | MF50: Message 61064 during planned order creation |
| 350452 | Unexpected display of Marker button in Planned order |
| 169827 | ATP: Insertion of simulated requirement incorrect |
| 529275 | Plnd order:ATPSERVER not current in case of reqmts diversion |
| 329948 | SAPLCXOT: "PARAMETERS_NOT_VALID" |
| 96107 | Order: scheduling with 'Adjust basic dates' |
| 166296 | Planned ord: Ref. op. set referenced sev. times |
| 82096 | MD13,MD12: Display configuration, revision level |
| 818657 | Planned order with alternative production plant not shown |
| 421497 | Rounding problems when splitting requirements |
| 157996 | Incor.qty distr.of compnents in plnd order procssng |
| 360886 | Sub-operation deallocated after scheduling |
| 130889 | Requirmnt qty 0 for components in AFS planned order |
| 34750 | Dispatch/deallocate operation: Change order quantity |
| 158595 | Assembly: incorrect delivery proposal |
| 376908 | Planned order has component with quantity Zero |
| 171968 | Incorrect requirements dates in planned order |
| 312087 | Planning check for planned and production order |
| 80200 | Display of availability dates in planned order |
| 449429 | Sub-operation: KBED-VORNR does not contain operation number |
| 516684 | Rounding problems when splitting requirements (2) |
| 166358 | Missing data for subcontracting components |
| 158732 | Missing compnts in prod.order f.conv.from plnd ordr |
| 447451 | Basic finish date is moved in planned order |
| 130864 | Reqments date components in scheduled planned ord |
| 184898 | Missing component assignment in the planned order |
| 99631 | Quantity adjustment for alternative BOM items |
| 146132 | Planned order: Error when component display called |
| 85640 | Planned order: Characteristic grouping |
| 351178 | Incor statistics drng update sales order fr plannd o. |
| 647279 | Planned order: Unit of measure with availability check |
| 129661 | Dep.requirements date/scheduling planned order 1.0D |
| 443446 | Planned order/SC procurement proposals: Availability check |
| 86369 | MD11,MD12: directly produced compnts in plnd order |
| 69001 | Planned order: requirements date of mat. components |
| 165940 | MF70: Planned order quantities are incorrect |
| 380389 | ONR00 entries for object types O1, O2 without KBED |
| 128122 | Scheduling of planned order: Changing work center |
| 632951 | Basic date in planned order incorrectly adjusted |
| 141939 | AFS: Comp.in Prod.order w/o category after conv.from chgd.Pl |
| 386279 | Lead time/lead-time offset in planned order |
| 328045 | 'AFS adopt grid qties' button without function |
| 350271 | Incorrect conversion between order units |
| 632598 | MF70:Incorrect GR qties, short dump TABLE_INVALID_INDEX |
| 362265 | Requirmts dates in pland order w/phantom assemblies |
| 129707 | Reqmnts date components in scheduled planned order |
| 183083 | J_3AMRP4: "Fixed" indicator/production order |
| 209109 | Basic dates are on non-working day after adjustment |
| 377792 | Scheduling planned order for recipe incorrect |
| 39032 | No BOM explosion with production version |
| 207998 | MRP: Scheduling in the planned order |
| 332255 | Dump for planned order scheduling with phantom |
| 52784 | MF40: component quant. + MF43: secondary require. |
| 520081 | ONR00 entries for object types O1, O2 without KBED |
| 192714 | Scheduling via capacity versions |
| 764611 | FAQ: Static assembly |
| 164722 | AFS Check report for receipts/requ. without date |
| 517373 | Move time from matrix scheduled incorrectly |
| 416932 | Confirmation planned order: No reading of component assignme |
| 162845 | AFS Check report for subcontracting planned orders |
| 582320 | MD11/MD12:Error during basic date determin. in planned order |
| 324542 | CM21: Error when dispatching AFS planned orders |
| 386345 | Lead time taken into account twice in the planned order |
| 625196 | Planned order: Rounding of co-products / by-products |
| 309081 | Requirmts dates in plnd order w/ phantom assemblies |
| 781632 | Constant new explosion in SAP APO after changes in SAP R/3 |
| 436360 | MD12 scheduling Planned Order incorrect dates in J_5CL |
| 190002 | MRP, planned order,... incorrect BOM explosion |
| 356120 | Planned order:refnce.operation set referenced several times |
| 536617 | Order dates of planned order incorrect for night shifts |
| 781749 | R/3-APO: Method for the planned order integration |
| 651537 | R/3-APO: R/3 re-explosion does not cause re-explosion in APO |
| 90381 | Date shift by one day in the order |
| 611153 | APO<->R/3: Planned order dates check (modification) |
| 103717 | Quantity adjustment after manual component change |
| 46155 | Subcontr.and phant.assemb.:SK-BED not LB-BED UK&NOTE_SYMPTOM |
| 303485 | Runtime problems during ATP check |
| 194019 | Basic dates, production start are incorrect |
| 318616 | Plnd ordr:Ordr start date later thn ordr finish dte |
| 184543 | Scheduling planned order: Incorrect component dates |
| 90663 | Capacity reqs planning: Unit unknown; distribution |
| 204409 | Incorrect requirements dates during dispatching |
| 340018 | Error using 'Adjust Quantities' w/o maintaining Bundles |
| 602625 | MF50:order finish date for night shifts |
| 160736 | Configuration for result-oriented order BOM |
| 122019 | Error in date proposals during component check |
| 411618 | MRP explodes material BOM instead of WBS BOM |