| 512790 | Performance problems when processing many orders |
| 52038 | MD01: Resched.check when ord.finish = per.end |
| 1119048 | Scheduling agreement item not proposed for settling |
| 150581 | 4.6A Characteristics planning with <, <=, >, >= |
| 425143 | Interactive planning: Incorrect/missing components |
| 319434 | Dump when scheduling several planned orders |
| 686785 | Incorrect or negative quantity in field EKPO-MENGE |
| 206399 | MRP: Material shortage in MD04 after planning |
| 113115 | Components are lost during manual rescheduling |
| 133438 | Characteristics planning NOT w/ usage of user exit |
| 126723 | ECR: Too many components in planned order |
| 580414 | EBP: PReqs generated by MRP are not transferred |
| 132890 | Charctristics planning: supportng points not stored |
| 31156 | Selection of alternative bills of material |
| 324120 | Dump in planning run: owner MARA ... does not exist |
| 77408 | Discontinued parts and safety stock |
| 808291 | VL10D: delivery quantity too high |
| 865621 | AFS MRP (/AFS/MD02) halts with exception message no. 61060 |
| 49778 | COMPUTE_FLOAT_ZERODIVIDE in SAPLM61U |
| 529275 | Plnd order:ATPSERVER not current in case of reqmts diversion |
| 426422 | CALL_FUNCTION_CONFLICT_TYPE during takt-based scheduling |
| 314100 | Periodic lot size: delivery date not at beginning of period |
| 73558 | Dispatch planned order: Incorrect component dates |
| 331923 | MD04: Returns delivery is not displayed |
| 143487 | BOM explosion in planned order |
| 625857 | 351451: Work breakdown structure BOM is not transferred |
| 154161 | BOM explosion in planned order III |
| 148029 | BOM explostion in planned order II |
| 789711 | MD03: Unanticipated message M8 815 in requirements planning |
| 81377 | Source determination for CC delivery |
| 359288 | Incor.available qntity for scheduled planned orders |
| 400155 | Period lot size: delivery date not on start of period II |
| 77577 | Performance mat.req.s planning, production versions |
| 73467 | Discontinued parts with distribution key |
| 132494 | Forecast:incorrect period with fiscal year variant |
| 410754 | Delivery schedules generated manually not changeable |
| 351738 | Error in Note 189826: Rough-cut scheduling |
| 78244 | Planned order: Change in single-item planning |
| 205121 | MD01: Incorrect dates during date specification = 3 |
| 40847 | Scheduling for schedule lines |
| 160004 | AFS Copying of secondary requirement |
| 120546 | MRP: Procurement proposal in the past |
| 797366 | MD03: Message ME 814 with stock transfer items |
| 421465 | Corr. Note 409130: New delivery schedules cannot be changed |
| 447451 | Basic finish date is moved in planned order |
| 51715 | Planned order: Reset buffer tables |
| 107942 | MD03 ME38 delivery schedule without components |
| 328907 | MRP controller as creator of PReqs from MRP run |
| 501895 | Returns purchse order not taken into account for MRP type V1 |
| 53090 | Planning performance, stock transport orders (3.0C) |
| 71482 | Discontinued parts and make-to-order production |
| 371016 | MRP: Material is not planned for MD01 / MDBT |
| 362704 | Inappropriate JA text for MRP element data |
| 416199 | Planning mode 1: no scheduling of firmed planned orders |
| 51706 | BOMs: Low-level code 999 for co-products |
| 132623 | Discntnuatn after consumption:missng rqmts divrsion |
| 188225 | MD01: Planning file entry not reset |
| 65737 | MRP run: Error message 06 859 without further info |
| 369732 | MD04 Missng stck transport schedlng agrmnts in issuing plant |
| 747349 | Problms through EKPO-MENGE is <> than total of EKET-MENGE(2) |
| 632951 | Basic date in planned order incorrectly adjusted |
| 174198 | Man.rescheduling of subcontractor delivery schedule |
| 547465 | R/3->APO: COM error 079 after planning run in R/3 |
| 165852 | Period total:SAFT consumed twice (MF50, MD04) |
| 78091 | Planning mode 1 and change issue storage location |
| 73780 | Production order has no effect on availability |
| 301681 | Doc: MRP takes no customer consignment stock into account |
| 614485 | Takt scheduling incorrect in case of several sales orders |
| 664084 | Sel. f. several valid scheduling agreements in source list |
| 199757 | MD04 Reservation loses ref. to sales order |
| 362265 | Requirmts dates in pland order w/phantom assemblies |
| 67589 | MD:Assigned shipping notification in wrong segment |
| 81469 | MRP, long-term planning |
| 141803 | Subcontractor requiremnts in wrong planning segment |
| 39032 | No BOM explosion with production version |
| 369032 | Error TD607 in PFS upload / performance MRP |
| 207998 | MRP: Scheduling in the planned order |
| 332255 | Dump for planned order scheduling with phantom |
| 42511 | BOM: Error in low-level code assignment |
| 171363 | MRP type V1/V2 and stock transfer reservations |
| 84823 | Pland.orders in plnng time fence for prd lot size |
| 172208 | MD01: Plant = vendor, no planning file entry |
| 425314 | MRP and fiscal year variant: Incorrect dates and quantities |
| 76747 | MRP: EM 61060 'The date 00/00/0000 not convertible' |
| 204802 | KKS2, CO88, production order: Error KV216 |
| 409130 | Planning: Subcontr.deliv.sched. w/ partl delivery changeable |
| 413887 | Incorrect configuration when changing a schedule line date |
| 960410 | Forecast value in current period with decimal places |
| 145272 | MRP:Stk transfer w/ plant = vendor f. sched. agrmnt |
| 84186 | Planning file entries and external requirements |
| 186608 | Periodic lot size: Order proposal too late |
| 386345 | Lead time taken into account twice in the planned order |
| 625196 | Planned order: Rounding of co-products / by-products |
| 842976 | Component in planned order although not production-relevant |
| 430184 | Maintenance order: missing rescheduling check |
| 211628 | MRP: Stock transfer with vendor = plant |
| 140661 | Rescheduling of capacity-firmed planned orders |
| 89701 | Component allocation lost (planning mode 1 or 2) |