| 526227 | MD01: In MRP-total planning short dump occurs |
| 576460 | Plan Order doesnot exist but displayed in MRP after MD01 |
| 332918 | MD04/MD05: Display/change PReq |
| 135119 | Stock/requirements list : pick up on reservations |
| 163567 | Insufficient performance |
| 567243 | Plan Order doesnot exists in the system but display by MRP |
| 699079 | AFS MRP creates stock proposals without grid values |
| 512790 | Performance problems when processing many orders |
| 142537 | Parallel processing for AFS MRP according to SAP standard |
| 49074 | MD01: Performance: Log is initialized |
| 52038 | MD01: Resched.check when ord.finish = per.end |
| 928831 | MD06 : Plant stock shows incorrect value for CS materials |
| 150581 | 4.6A Characteristics planning with <, <=, >, >= |
| 49429 | Performance: No routing check |
| 109341 | MD04: Branch to SD quotation --> Change |
| 72885 | 3.1H Variant configuration - Storage release |
| 196861 | Material status MM/PP is ignored in total planning |
| 319434 | Dump when scheduling several planned orders |
| 191949 | ECH: Performance improvement |
| 133438 | Characteristics planning NOT w/ usage of user exit |
| 126723 | ECR: Too many components in planned order |
| 339431 | No MRP outside SKU horizon if SKU indicator set |
| 580414 | EBP: PReqs generated by MRP are not transferred |
| 34595 | Performance: TIME_OUT during scheduling |
| 541478 | Different delivery date in PReq on material/ schedule line |
| 168712 | Check/Correction Report:AFS_Dependent Requirements |
| 208852 | No BOM explosion in spite of planning mode '2' |
| 31156 | Selection of alternative bills of material |
| 206919 | Deadlocks on table J_3AMRPR |
| 77408 | Discontinued parts and safety stock |
| 808291 | VL10D: delivery quantity too high |
| 865621 | AFS MRP (/AFS/MD02) halts with exception message no. 61060 |
| 176540 | AFS MRP total planning batch run |
| 167766 | Periodic lot sizes: Start date determination |
| 49778 | COMPUTE_FLOAT_ZERODIVIDE in SAPLM61U |
| 426422 | CALL_FUNCTION_CONFLICT_TYPE during takt-based scheduling |
| 314813 | MRP run with scope of planning loops |
| 314100 | Periodic lot size: delivery date not at beginning of period |
| 550093 | Different data in PReq on material/schedule line view |
| 363620 | MM/PP creates incorrect termin.message in MD01/MDBT |
| 809640 | MD01: UM815 w/ parallel execution of mat requiremts planning |
| 332722 | MD01: Total planning parallel proc. for CS material |
| 143487 | BOM explosion in planned order |
| 154161 | BOM explosion in planned order III |
| 148029 | BOM explostion in planned order II |
| 81377 | Source determination for CC delivery |
| 359288 | Incor.available qntity for scheduled planned orders |
| 519506 | BOM explosion: Short dump when using functions |
| 400155 | Period lot size: delivery date not on start of period II |
| 77577 | Performance mat.req.s planning, production versions |
| 73467 | Discontinued parts with distribution key |
| 184171 | MRP planning run with configurable materials |
| 132494 | Forecast:incorrect period with fiscal year variant |
| 351738 | Error in Note 189826: Rough-cut scheduling |
| 156582 | Parallel planning w/ user exit: statistics display |
| 382541 | ECH: Performance improvement of effectivity during MRP run |
| 207197 | Additional info for Note 186608 |
| 205121 | MD01: Incorrect dates during date specification = 3 |
| 40847 | Scheduling for schedule lines |
| 378176 | MDVM is not changed for change material for AFS |
| 48281 | Performance for material quantity calculation |
| 529206 | Headr quantty and schedle line quantity in PReq not the same |
| 120546 | MRP: Procurement proposal in the past |
| 395069 | Parallel planning with scope of planning loops - II |
| 447451 | Basic finish date is moved in planned order |
| 380807 | Incorrect components in collection proposals |
| 51715 | Planned order: Reset buffer tables |
| 107942 | MD03 ME38 delivery schedule without components |
| 501895 | Returns purchse order not taken into account for MRP type V1 |
| 34265 | MRP: Intervals of available capacity are not observed |
| 53090 | Planning performance, stock transport orders (3.0C) |
| 50905 | 3.0D,3.0E IMPORTANT: Planning run performance |
| 504976 | Subcontracting PO coverted from a PR has incorrect quantity. |
| 71482 | Discontinued parts and make-to-order production |
| 178126 | Update component status in MRP run |
| 783822 | AFS Online MRP: Deadlocks between table MDKP and MDVM |
| 66379 | 3.1G: Incorrect relationships in MRP, performance |
| 371016 | MRP: Material is not planned for MD01 / MDBT |
| 549823 | MRP creates purchase requisitions without grid values |
| 155335 | Parallel planning: User exit does not stop |
| 504153 | SAPSQL_ARRAY_INSERT_DUPREC (J_3ABSSI) |
| 416199 | Planning mode 1: no scheduling of firmed planned orders |
| 181014 | Enhancing rprt J_3AMRP4 by correctn of pland odrs |
| 51706 | BOMs: Low-level code 999 for co-products |
| 132623 | Discntnuatn after consumption:missng rqmts divrsion |
| 188225 | MD01: Planning file entry not reset |
| 65737 | MRP run: Error message 06 859 without further info |
| 184851 | Initialization of AFS MRP run |
| 632951 | Basic date in planned order incorrectly adjusted |
| 547465 | R/3->APO: COM error 079 after planning run in R/3 |
| 78091 | Planning mode 1 and change issue storage location |
| 371915 | Incor. BOM explosn after change of bill of material |
| 73780 | Production order has no effect on availability |
| 301681 | Doc: MRP takes no customer consignment stock into account |