| 129325 | Planng table:incrrct historicl values drng forecast |
| 60153 | Incorrect capacity calculation in planning (SOP) |
| 68684 | SOP: Pegged requirements display |
| 74490 | Incorrect warehouse stock after period breakdown |
| 93065 | No change query when leaving the planning table |
| 94620 | Level-by-level planng:copying data f.product groups |
| 87473 | SOP: Original stock level without decimal places |
| 77712 | Capacity requirements are lost/swapped |
| 34750 | Dispatch/deallocate operation: Change order quantity |
| 102058 | Incrrect capacity requirements for members of a PG |
| 67580 | Capacity utilization is only partially calculated |
| 733442 | Forecast: Short dump COMPUTE_FLOAT_ZERODIVIDE |
| 88294 | SOP: selective period division; disaggregatng month |
| 84066 | Date fields for sub-operation/elements empty |
| 129456 | SOP planning: resource requirements for components |
| 85255 | Sales/rough-cut planning:requiremnts not displayed |
| 74628 | Rounding error during data backup |
| 704356 | Forecast: Zero historical values with seasonal model |
| 71461 | Leading zeros of materials in the planning table |
| 83896 | Capacity reqs. incorrectly reduced or duplicated |
| 710283 | Forecast: Short dump "CONVT_OVERFLOW" |
| 897541 | Planning: Cumulative event displayed incorrectly |
| 128305 | Two-step planning type:Incorrct display of members |
| 83350 | Hide capacity -> Incorrect key figure view |
| 88418 | Capacity reqs planning: no lot-size range change |
| 79404 | Multiple occupancy of available capacities |
| 87670 | Rounding error in flexible planning |
| 18826 | SOP: T009B not fully maintained |
| 89327 | Capcty reqs planning: incrct reqs after scrolling |
| 86183 | Capacity requirements from past periods |
| 72281 | No fiscal year variant with a period |
| 88480 | Cap. requirements planning: display error after job |
| 90663 | Capacity reqs planning: Unit unknown; distribution |
| 41634 | Preliminary Correction: SOP and Flexible Planning -> 3.0D |
| 64834 | MC76: Internal error 010 |
| 49739 | No resource load for flexible info structure |
| 82407 | Cap. rqmnts planning w. rough-cut planning profile |