| 68684 | SOP: Pegged requirements display |
| 81683 | Transfer of key figure units to rough-cut planning |
| 74490 | Incorrect warehouse stock after period breakdown |
| 77712 | Capacity requirements are lost/swapped |
| 67580 | Capacity utilization is only partially calculated |
| 74628 | Rounding error during data backup |
| 71461 | Leading zeros of materials in the planning table |
| 83896 | Capacity reqs. incorrectly reduced or duplicated |
| 65170 | Change period division in planning table |
| 650807 | SOP: Changing period splitting not possible |
| 83350 | Hide capacity -> Incorrect key figure view |
| 88418 | Capacity reqs planning: no lot-size range change |
| 79404 | Multiple occupancy of available capacities |
| 18826 | SOP: T009B not fully maintained |
| 86183 | Capacity requirements from past periods |
| 72281 | No fiscal year variant with a period |
| 88480 | Cap. requirements planning: display error after job |
| 90663 | Capacity reqs planning: Unit unknown; distribution |
| 41634 | Preliminary Correction: SOP and Flexible Planning -> 3.0D |
| 82407 | Cap. rqmnts planning w. rough-cut planning profile |