| 134033 | Planning hierarchy: Proportions calcultd incrrectly |
| 106635 | Plan. hierarchy maintnance:level-by-level plnning |
| 158303 | Error when copying the planning hierarchy |
| 104981 | Planning hierarchy: deleting product groups |
| 624731 | MC62: Bad performance with large hierarchies |
| 1377716 | Selection button is missing in Program /SAPAPO/TS_PSTRU_TOOL |
| 106423 | Planning hierarchy mainten.f.level-by-level plnning |
| 916641 | MC59: Using the transaction |
| 598654 | MC62:Info struct. deleted after term. delete all members |
| 1408177 | MC62/MC63: Error MC257 after product group is changed |
| 631323 | Planning hierarchy: Known problems |
| 547439 | Aggregation factor column without function |
| 512300 | MC94: Error MA257 with aggregated planning |
| 534302 | Planning hierarchy: Generation error in the screen |
| 609454 | APO-DP: Short dump ITAB_DUPLICATE_KEY |
| 82353 | Termination when saving the planning hierarchy |
| 769388 | MC59: Dump when inserting new members |
| 500600 | Regenerating planning hierarchy |
| 198272 | Generation error flex. planning/planning hier. (2) |
| 82615 | Planning hierar. maint:Dialog box for portion total |
| 118426 | Units of measure in planning hierarchy are incorrct |
| 1382112 | Planning: BASME changed for planned information structure |
| 76250 | Termination when saving the planning hierarchy |
| 109891 | Planning hierarchy maintenance:Base unit of measure |
| 674719 | Planning hierarchy: Highest level is deleted |
| 49498 | missing characteristics after copy in pl.hierarchy |
| 79802 | Termination when generating planning source code |
| 83815 | Planning hierarchy: deleting sub-tree completely |
| 65958 | Actual data is deleted by planning hierarchy update |
| 73145 | Planning hierarchy: 'Copy from' - multi-level |
| 843780 | CBF: Long runtime for /SAPAPO/TS_PLOBS_GENERATE |
| 101626 | Level-by-level planning: units conversion from to |
| 135134 | Incorrect BASME for materials in hierarchy table |
| 93380 | Planning hierarchy: copying entire sub-tree |
| 82449 | Rough-cut planning profile is not deleted |
| 93936 | Planning hierarchy: incorrect copy function |
| 86340 | Planning hierarchy: multi-level - delete |
| 646524 | Repairing the unique index of a planning object structure |
| 1590418 | /SAPAPO/MC62 : Short dump when displaying details of a Log |
| 402046 | Error message 'No LiveCache anchor found' |
| 60377 | Planning hierarchy: Copy from => multi-level |
| 395654 | Generating characteristics combinations with nav. attrib. |
| 167621 | Generation error flex. planning/planning hierarchy |
| 494522 | System response with unique characteristics combination |
| 1306604 | /SAPAPO/MC62 authorization for creating CVCs |
| 118026 | Product group: Unit conversion for material |
| 600976 | MC62: Data deleted from info structure after saving |
| 396708 | Problems due to the 9APLOBJ key figure |
| 78456 | Version: Possible entries pushbutton is incorrect |
| 560657 | Performance improvement for the planning |
| 492460 | Check double entries in planning object structure |
| 1623389 | /SAPAPO/MC62: Short dump when displaying details of a Log II |
| 82745 | Explanations on the 'Calculate proportions' funct. |
| 137143 | End of the number range for generated screens |
| 185520 | Plan hierchy mainten: Base unit + conversion factor |
| 506393 | Conversion exits when creating characteristics combinations |
| 71334 | Material number display is ignored |
| 598689 | Termination /SAPAPO/MC62 create characteristics combination |
| 998720 | DP/SNP: Runtime error GEN_BRANCHOFFSET_LIMIT_REACHED |
| 920027 | How to rebuild the Planning Hierarchy in Consistent Planning |
| 1329960 | Selection text is missing in Program /SAPAPO/TS_PSTRU_TOOL |
| 394610 | DP 3.0: no new characteristics combinations |
| 669068 | Consulting: Termination during realignment/copying |
| 669496 | SCM 4.1 upgrade: Additional authorization checks |
| 1172719 | Planning object structure: Problems with NW 7.0 SP16 |
| 301488 | Demand Planning: Actions after 3.0A upgrade |
| 841358 | FAQ: Flexible Planning |
| 492399 | Realignment tool - Consulting |