| 1081448 | Confirmation using variant transaction |
| 193778 | JV Amendment for note 101872 |
| 402107 | Message KM888 in module TP_AC_EXTENSION |
| 105373 | CO11: Deleted goods movement always finally issued |
| 104523 | No costs during change of work center |
| 97901 | Termination with error message BM398 |
| 446401 | Goods movement overview: no check of 'vendor' field |
| 131770 | CO11: Dump after calling up goods movement overview |
| 305595 | Confirmation: Multiple component update |
| 144679 | GR for order via MB_CREATE_GOODS_MOVEMENT |
| 113622 | CO11: Final issue indicator is not set |
| 360767 | CO13: Unplanned goods movement is not displayed |
| 709062 | Error in goods movements for PP-processes with BOM 7 |
| 85896 | Confirmation sets up capacity requirements again |
| 554507 | Partial confirmation with quantity 0 sets status 'Delivered' |
| 805783 | Incorrect remaining duration after confirmation |
| 180461 | Posting date of last confirmation not filled |
| 449911 | Transactions disappear in APO after confirmation |
| 92900 | Error 53527: Confirmation w.personnel no. w/o HR |
| 356339 | Coll.order:Incorr.actual quantities f.autom.confrm. |
| 384283 | Syntax error: Confirmation for production order |
| 211397 | CO1F: No status check for subordinate orders |
| 355816 | Authoriztn check missing whn branching to transactn |
| 99631 | Quantity adjustment for alternative BOM items |
| 197669 | Capacity requirements despite of final confirmation |
| 304668 | CO11, CO15: 'Final issue' indicator incorrectly set |
| 639630 | Termination upon confirmation in batch input |
| 100612 | CO11: Termination ERROR_READ_AFVG |
| 364742 | Materl overview: Valuation type not ready for input |
| 857780 | No actual costs with confirmation |
| 150787 | Update termination after confirmation for the order |
| 194347 | Deadlocks in table MCAFPOV |
| 680224 | CO11/COR6: Business process is not updated in the operation |
| 318412 | Cap. rqmnts exist although order finally confirmed |
| 76407 | CO11: Predecessor order in collective order deleted |
| 73410 | Milestone confirmation w/o sub-operations from ntwrk |
| 386310 | Multiple GR by-product despite firm quantity |
| 591524 | Collective order processing: Undesired TAs/TBs |
| 421940 | No reduction of order reservations in APO |
| 688883 | Confirmation with price 0: Message BK 057 |
| 370062 | CO1F/CO11: Error RU076 if DLT in collective order |
| 126898 | Confirmation with goods receipt for inspection lot |
| 402286 | Goods movement: Incorrect reason in material document (2) |
| 656829 | Confirmation: Error M7021 w/ incorrect quantity specificatn |
| 397354 | Goods movement:incorrect reason in material document |
| 88289 | Delivery date missing after fin.confirmatn w.qty 0 |
| 52784 | MF40: component quant. + MF43: secondary require. |
| 505460 | Termination with confirmation in batch input |
| 194608 | CO11: Final issue for direct production assembly |
| 387752 | Correction report for process ordrs according to Note 316462 |
| 945417 | Error in goods movements in collective order |
| 406522 | Co-/by-product: Quantity negative or deletion in the APO |
| 49821 | Delivery date missing in order from collect. order |
| 77839 | CO11: Final issue indicator disappears |
| 529054 | No SLED dialog box for unplanned GR by-product |
| 380712 | Poor performance for confirmation |
| 353581 | Itm sorting in material document after confirmation |
| 535816 | No COFC records for incorrect actual costs |
| 184272 | Read and lock PREQ for confirmation entry |
| 379562 | Collective order processing: Not required TOs/TRs |
| 128882 | CO11: Direct production assembly is open again |
| 162883 | Reservation for by-products with negative BDMNG |
| 177799 | Incor. qty of goods receivd for fixed by-product |
| 533384 | Confirmation with actual costs: Duplicate CO documents poss |
| 386138 | Incorrect delivery status according to GR posting |
| 430105 | No available qty for batch determination in confirmation |
| 88097 | CO11: Trigger point: quantity withdrawn = 0 |
| 1082779 | System does not return to variant transaction |
| 150819 | CO11: Incorrect proposed qty in collective order |
| 542590 | Confirmation with actual costs: Double CO documents |
| 1647060 | Teilrückmeldung mit Menge Null setzt Istendtermin |
| 106537 | Missing inspectn lot after automatic goods receipt |
| 548888 | Confirmation:No SLED-dialog box w/ internal 'Batch creation' |
| 381268 | Update goods movements MESSAGE_TYPE_X RU 888 |
| 63829 | CO11/CO15:Messages from WM: batch split or similar |
| 80177 | MMIM: MB_CREATE_GOODS_MOVEMENT items are missing |
| 92272 | Status set as confirmed, confirmation is missing |
| 1718869 | FAQ: Confirmation |
| 141212 | Reset 'Capacity requirements' indicator |
| 365904 | GR order: Internal error SAPLCKMLMVCONNECT |
| 538667 | No or incorrect goods issues for confirmations |
| 441579 | R/3->APO: Operations appear after confirmation |
| 446294 | CC INFO: Logical system name and client copy |
| 190852 | COR6:Termination due to OPR_NOT_FOUND in coll.order |
| 122404 | COR6:Production plant is missing in structure BNCOM |
| 111508 | Incorrect delivery date after conf. with quantity 0 |
| 112542 | CO11 w/ backflushed goods movement: Quantity withdrawn = 0 |
| 38108 | Automatic goods receipt for manufacture of co-products |
| 333044 | Dependent goods movements with incorrect doc. date |
| 1633997 | Automatische Rückmeldung: Geschäftsprozess falsch |
| 459241 | APO order quantity after confirmation with scrap or more |
| 324867 | Incorrect actual qties from automatic confirmations |
| 536666 | Confirmation with actual costs: Duplicate CO docs possible |
| 95292 | SAP-Office: Data inconsist. storing certain lists |
| 80373 | MMIM: MB_CREATE_GOODS_MOVEMENT and valuation type |
| 337913 | Missing components for milestone confirmation |
| 454709 | Data loss in order/network operations |
| 84646 | Qty issued too high for comp. w. fixed quantity ind. |
| 569483 | Confirmation: unnecessary planned confirmations for actual c |
| 355894 | Dependent goods movemts:error M7021 for no valid reason |