| 122530 | Performance improvements PS system |
| 357075 | Calling up CNEX0012 with edited WBS element no. |
| 61684 | WBS scheduling: Adjust basic dates |
| 138641 | Incorrect activity display in structure planning |
| 573113 | ALE: Projects are distributed with incorrect project ID |
| 307014 | Required field check when saving:checks are missing |
| 448576 | Default specification 'With activities' on selection screen |
| 44632 | Popup for ext. no. assignment in structure planning |
| 311229 | Missing messages when you create or save project |
| 121644 | Dump when including standard network |
| 460647 | Subnetwork via milestone function: Settlement rule |
| 614553 | Short dump MESSAGE_TYPE_X due to NESTED_PERFORM_ON_COMMIT |
| 492590 | Integrated release in PS: NOT_FOUND |
| 323146 | Display/hide activities with deletion flag |
| 534217 | WBS dates: SAPSQL_ARRAY_INSERT_DUPREC after Note 440698 |
| 451938 | WBS element settlement rule: Copy, performance |
| 384128 | Call of CNEX0012 with edited WBS element no. II |
| 102676 | Termin.when creating subnetwork and external number |
| 615023 | CJ2B/CJ20N: Creating project via project definition template |
| 556027 | Scheduling scenario does not overwrite the planning method |
| 375520 | Update termination after creating and deleting network |
| 83575 | Inform.messages for external number assgnmnt in PPB |
| 408075 | Network: Error message 06334 for source of supply determintn |
| 633557 | Copy WBS element: No settlement rule |
| 420071 | Network costing: Complete costing instead of update |
| 444031 | Structure plng -> proj. png board: Plng board profle fr. PPL |
| 546919 | Douplicated heading in error log from status check |
| 495301 | Deletion of last activity in the network: MESSAGE_TYPE_X |
| 146924 | Include subnetwork by milestone function |
| 574317 | Network: Error msge 06334 for source of supply determintn II |
| 525853 | Creating network with template: Copying configuration |
| 415283 | AVO_ALREADY_EXISTS w.creatng/changng ext.prcssd act.and PReq |
| 437270 | CJ2B: Missing profile settings in Gantt chart/PPB |
| 173405 | Network: CO888 or double activity number |
| 188038 | CJ20, CJ2B: PLNAW_UNKNOWN_LCOVGFFR |
| 418141 | Copying customer number proposed (after Note 396340) |
| 130142 | CO010 after creating netwrk by copying stand. ntwrk |
| 435594 | CJ2B: Automatic substitution/validation in network II |
| 380175 | IW31/IW32: Source determination, message 06334 |
| 618707 | WBS elmnt: Distrbtn rule at prof seg after MasterData change |
| 46623 | Creating project with reference, copy profile data |
| 610613 | Copying project w/activities:Flags Res/PurcRq and Cap.reqmts |
| 216273 | Termination when creating project with template |
| 713505 | Milestone for WBS element displayed w/o authorization |
| 629275 | Copying WBS element: Dependent data is incomplete |
| 386032 | PReq for external activity: dump or incorrect plann.indictr |
| 422905 | Creating component + selecting source of supply: Error ZF253 |
| 622280 | WBS element: Results analysis key and investment profile |
| 137606 | Investment measure: authorization for fixed assets |
| 490916 | Project creation with template: Data from project profile |
| 523292 | WBS elements without COBRA-record |
| 396340 | Address for third-party requistn in network despite 'Cancel' |
| 503166 | Address for third-party requisition from SD document |
| 481469 | Copy WBS element, hierarchy graphic: TABLE_INVALID_INDEX + |
| 532324 | Termination CO901, CO888, C7135 after Note 217660 implementd |
| 300641 | Termination CO901, CO888, C7135 after implem. of Note 217660 |
| 388778 | Tabstrips at batch input / conversion or changing from APO |
| 569048 | FAQ 2: User status |
| 447435 | Deleting activity with summarization: CL585, C6018 and other |
| 32390 | Proj.summariz.: BO003 'System error: inval.obj.type' |
| 81091 | Term./performance for planning board/network sched. |
| 578106 | PS text migration to new SAP Office Integration (SOI) |
| 420985 | User-specific time profile settings |
| 382633 | Deletion of projects/networks in time-dependent versions |
| 498761 | Scheduling scenario in the standard project |
| 63506 | Upd.term.when saving plg.table/overall ntwrk sched. |
| 501462 | Update termination during INSERT in table VSPROJ_CN |
| 494256 | Project: Scheduling scenario, forecast start/finish missing |
| 596330 | CJ2B: Display additional fields in table area |
| 455255 | CJ2B: Font in the date bar cannot be changed |
| 407160 | Project planning board: Composite note of dates & durations |
| 500933 | Proj.plng board: Recomm., additional information, consulting |
| 371842 | Customized options, time scales, and field selection |