| 305274 | WBS date entry: Error messages CJ563 |
| 168670 | TIME_OUT after Note 135669: position WBS element |
| 162853 | ALE WBS:Logical system not filled i.receivng system |
| 123852 | WBS Batch input: No positioning on WBS element possible |
| 307014 | Required field check when saving:checks are missing |
| 110804 | Terminatn in CLVF_VB_INSERT_CLASSIFICATION when creating WBS |
| 322408 | Copying WBS element with incorrect reference |
| 61886 | SAP enhancement CNEX0002: No authorization |
| 117673 | CJ02: Branch to scheduling overview -> Postioning lost |
| 150570 | WBS: Error message CJ771 during batch input |
| 518674 | Termination CONVERT_NO_NUMBER in SAPLPSSV_CHECK |
| 115482 | Positioning WBS element does not support wildcard characters |
| 313634 | WBS actual finish date - check of dependent objects |
| 213968 | Incor. profit center after change of contrllng area |
| 312966 | Requesting company code is not redetermined |
| 323509 | Unnecessary checks in the project definition |
| 32946 | WBS: Update terminat. CLVF_VB_INSERT_CLASSIFICATION |
| 96571 | PS: Long runtime in update2 |
| 614553 | Short dump MESSAGE_TYPE_X due to NESTED_PERFORM_ON_COMMIT |
| 446994 | CJ2B: ERROR_KBED_VB_CHECK when saving |
| 135669 | Position on WBS element is incorrect after Note 115482 |
| 68452 | Error message KD059 when creating order / WBS elem. |
| 122530 | Performance improvements PS system |
| 183141 | Error in hierarchy number of settlement rule |
| 130869 | Settlement rule: Validity period for shortened fiscal year |
| 534217 | WBS dates: SAPSQL_ARRAY_INSERT_DUPREC after Note 440698 |
| 574958 | Terminatn of mainten.of depr.simulation data of WBS elements |
| 451938 | WBS element settlement rule: Copy, performance |
| 84866 | Settlemt rule: Validity period short fiscal year |
| 615023 | CJ2B/CJ20N: Creating project via project definition template |
| 556027 | Scheduling scenario does not overwrite the planning method |
| 644821 | Creating several WBS elements:CJ401 among others,termination |
| 633557 | Copy WBS element: No settlement rule |
| 44354 | Including proj. definition in summarization struct. |
| 440698 | Error or dump when copying WBS element from template |
| 949329 | Check length of external tax jurisdiction code Customizing |
| 40971 | IM: Assignment Pgm.pos<->Measures - AP114 / AP208 |
| 117894 | Settlement rule: entry '00' for year is ignored |
| 485784 | Performance problems when saving projects |
| 304957 | CJ080: Substitution interprets field selection |
| 92508 | Consistency of cap. invest. prog. item - measures |
| 47354 | Required entry in measures for capital investment program |
| 201910 | Sttlmnt rule to additnl accnt assgnmnt nt required |
| 74837 | AuC for investment measure -> AA243 |
| 618707 | WBS elmnt: Distrbtn rule at prof seg after MasterData change |
| 164526 | Create WBS->WBS elements to be included are missing |
| 46623 | Creating project with reference, copy profile data |
| 65434 | Problems with investment projects |
| 713505 | Milestone for WBS element displayed w/o authorization |
| 629275 | Copying WBS element: Dependent data is incomplete |
| 498136 | Project System: Temporary classification data |
| 502322 | Create with template: Derivation of WBS numbers (IDs) |
| 152513 | Function: Position on WBS element III |
| 622280 | WBS element: Results analysis key and investment profile |
| 139139 | Dump POSNR when returning fr characteristic value assignment |
| 546438 | Termination message GU506 not authorized |
| 150788 | Classification inconsistency in project |
| 137606 | Investment measure: authorization for fixed assets |
| 490916 | Project creation with template: Data from project profile |
| 301917 | Indicator integrated planning to project definition |
| 523292 | WBS elements without COBRA-record |
| 314653 | Settlement rule: KD119 as message you can customize |
| 170948 | Status inconsistency in work breakdown structure |
| 70716 | IM: Ass. of prog.positions <-> measures:AP114/AP208 |
| 86050 | Customer enhancement fields are not saved |
| 164852 | SettlmntRule: Business area with G/L account receiver |
| 328544 | Messages AP076 or AP154 for project creation |
| 145002 | Approp.request: generating WBS with standard WBS |
| 141463 | Settlement rule: error message KD117 |
| 35788 | IM: Budget/plan.values = 0 after update >3.0B or .. |
| 481469 | Copy WBS element, hierarchy graphic: TABLE_INVALID_INDEX + |
| 215113 | Field selection w/measure assignment not copied |
| 310366 | Settlement rule: Error message KD117 |
| 569048 | FAQ 2: User status |
| 303117 | WBS date entry: Error messages 00058 & CO032 |
| 201832 | Deletn flag not possible f required entry investment program |
| 32390 | Proj.summariz.: BO003 'System error: inval.obj.type' |
| 352832 | Settlement rule:termination for non-exist.settlement receivr |
| 356327 | Classification in orders, projects, networks |
| 578106 | PS text migration to new SAP Office Integration (SOI) |
| 64398 | WBS error during substitution |
| 382633 | Deletion of projects/networks in time-dependent versions |
| 498761 | Scheduling scenario in the standard project |
| 124498 | No required field check during asset creation |
| 328072 | Positioning on milestone overview for WBS element |
| 370958 | Consulting note:Frequnt problems during batch input |
| 501462 | Update termination during INSERT in table VSPROJ_CN |
| 51907 | Field selection of AuC of cap. investm. measure |
| 304891 | CJ080: substitution interprets field selection |
| 494256 | Project: Scheduling scenario, forecast start/finish missing |
| 47284 | AA918 alth. business area is not ready for input |
| 315637 | SettlmtRle: New interface control as of Rel. 4.0A |
| 554139 | FAQ 2: Batch input |
| 52631 | Enhancing KKRAMERK (Ref. Characteristics Projects) |
| 554415 | FAQ 2: Authorization check |
| 522426 | Consulting: Authorizations in the Project System |