Solution : https://service.sap.com/sap/support/notes/614928 (SAP Service marketplace login required)
Key words : 
performance measurement sem-srm/bic - stakeholder relationsship management business analytics sem-java - sem-cpm image generation ejbs 3, mysap-technology-components -> cross application functions -> web survey -> preparatory steps, sem-cpm image generation ejbs 3, dvd online documentation sem-bw/sem-bcs 3, simulation sem-cpm - strategy management, tcp/ip ip connection type, tools -> business communication -> communication -> sapconnect, tools -> administration -> user maintenance -> user, instance-independent / release-independent notes, sem-cpm web applications
Related Notes : 
       
| 688986 | Java Virtual Machine: Display of SEM-CPM Applets | 
| 688807 | SAP SEM 3.5: Status Unrestricted Shipment | 
| 672426 | SEM-BCS 3.5/SP6 importing prerequisites | 
| 634173 | Delta upgrade BI_CONT 320 -> 330 | 
| 614949 | FINBASIS 200 installation (with transaction SAINT) | 
| 614929 | SEM-BW 350 installation (transaction SAINT ) | 
| 614927 | SEM-BW 350 and FINBASIS 200 : Upgrade to BW 3.1CONTENT | 
| 597638 | Installing/upgrading Basis Plug-In (PI_BASIS) 2003.1 | 
| 597635 | R/3 Plug-In: PI 2003.1 installation/delta upgrade | 
| 588334 | Availability of SEM-BCS Release 3.2 | 
| 553260 | Master Guide mySAP BI - Using SAP BW 3.1 Content Server | 
| 546024 | Patch dependencies 3.0B -> 3.1 Content | 
| 545747 | Importing Support Packages into a BW 3.1 Content system | 
| 523335 | Installation SEM-BCS on existing R/3 instance (4.6C and 470) | 
| 445516 | RFC connections between SEM-BCS (based on R/3) & BW System | 
| 439915 | Exchange Infrastructure Integration Server 2.00 | 
| 424821 | You need information on the end of maintenance of the differ | 
| 358872 | SAP Cons.: Implementation guide for SEM-BCS | 
| 181255 | Overview: Notes about R/3 Add-Ons PI and PI-A |