Solution : https://service.sap.com/sap/support/notes/180435 (SAP Service marketplace login required)
Summary :
SAP Note addresses further corrections for P3G CEM V3.0A, applicable for systems with HP/LCP status 26, following a delta upgrade/installation. The solution involves importing specified transport requests into client 000 to include corrections and enhance Construction Equipment Management capabilities. It is crucial to regularly obtain updates for the latest corrections. Use of transaction SCC1 to manage client-specific data is advised post-import. It’s also important to not import BE0K004997 in HP/LCP status 22 scenarios. Additional customization modifications are provided for different statuses, ensuring system stability and data integrity post upgrade.
Key words :
hp/lcp status 26 additional key words p3g cem, directory /specific/iscem/v30a/score 0180435, tp import be0k004997 <sapsid> client=000, p3g cem delta upgrade v3, hp/lcp status 22 implement note 181817, rm63e-fcode = tabstrip-activetab, symptom p3g cem v3, installation p3g cem v3, 0a hp/lcp status 22, copying client-depending entries
Related Notes :
| 188066 | P3G CEM (constrctn soltn) Rel.4.0B/V3.0A CRTs 27-30 |
| 185440 | CEM billing doc without result account assignment |
| 181817 | CEM Abrechnung, Bestandsliste, Standortaufbau |
| 179984 | P3G CEM V3.0A installation / final notes |
| 177696 | P3G CEM (constr. solut.) Rel. 4.0B/V3.0A CRTs 23-26 |
| 147737 | Overview: Notes on R/3 CEM Construction Solution |
| 13719 | Preliminary transports to customers (note for customers) |