Solution : https://service.sap.com/sap/support/notes/161819 (SAP Service marketplace login required)
Summary :
When reconstructing availability control via Transaction CJBN in SAP, values of parked documents are ignored, causing inaccurately low assigned values. This issue is due to a software defect. To resolve, modify the HFPM_RPSCO_TO_RPSCO_LIS_CONV function module's interface to include an import parameter I_AV_CONTROL and follow proposed settings. Implement program corrections, then reconstruct availability control using Transaction CJBN. Enhance the report '13BUD1B' via Transaction CJE5 by configuring display options to include parked documents in the availability control reports. Finalize by updating settings and distributing the corrected report across clients with Transaction CJEQ.
Key words :
column heading 'parked documents' -> edit -> columns -> hide -> save call transaction cjem generate report 13bud1b, call transaction cje5 enter project report 13bud1b double-click, kafl business transaction kafn zzzz enter 'parked', budget distrib' add column 'parked documents', call transaction se37 select 'interface', type 60 object indicators 1 9 object indicator, debit type 1 business transaction, column select 'key figure, additional key words rpsco, column heading 'assigned
Related Notes :
| 537416 | Drilldown reporting: "Assigned" column in budget report |
| 368571 | CJBN: Parked documents are missing (value type 60) |