SAP Note 1224682 - LCC: Setting of cluster size

Component : Local Currency Conversion -

Solution : https://service.sap.com/sap/support/notes/1224682 (SAP Service marketplace login required)

Summary :
To investigate and modify table EWUCLCT settings for optimized parallel processing in SAP environments, SAP Note elaborates on potential incorrect entries detection, their implications during the CONVERSION phase, and appropriate corrections. The provided solution includes implementing report 'ZCNV_CHECK_CLUSIZE_HWU', which aids in determining suitable settings for CLU_SIZE and COM_BLOCK to ensure efficient parallel processing and update jobs. Recommendations for modifying parameters like TASK_NUMB, JOB_NUMB, and XPARLOCK, alongside execution guidance, are detailed, ensuring proper adjustment of table settings before and potentially during CONVERSION phases for optimal performance and stability.

Key words :
paket tabname clu_size  com_block task_numb job_numb parabclu xparlock150   bkpf    00300000  00060000  04        04      0020since, paket tabname clu_size  com_block task_numb job_numb parabclu xparlock150   bkpf    00000020  00000004  04        04      0020, tab_name glpca clu_size 99990000 com_block 00100000 task_numb 04 job_numb 04 parabclu 0020 xparlock, fields- clu_size- task_numb- job_numb- parabclu- xparlockcan, test system production system data volume 181209319 183415423 number, table ewuclstat field high-limit, 'select count' takes place, deactivate parallel processing explicitly, task_numb = '00' - selection task, ewuclstat-limit-high

Related Notes :

1539473LCC optimization - General questions/answers (FAQ)
495176Euro chngvr:termtn: No Clusterblocks written for table BKPF
433167Cluster euro: REUCLDOC does not write any clusters
400488Changes in EWUCLCT during the conversion phase?
397398Cluster: enqueue problem in the syslog is recognizable
384167Buffer synchronization; deactivate buffering for table ...
315196Cluster: Restart after system shutdown in Conversion phase
204338Problems with table EWUCLU after upgrade/euro changeover
202780Termin. VBAK, VBRK, EIKP, EKKO, AUAK due to memory overflow
189908Cluster: Change by means of program ZEWUCLCT
183158LC changeover to euro: Cluster functions
181476Cluster:Parallel processing on table level, performance
173993Cluster: System settings during Euro LC changeover
173846Cluster: Deadlock occurred in phase CONVERSION
168728Cluster: No. of clusters exceeds maximum