| DiagnosisMaterial &V1& has still project stocks in plant &V2&, storage locationV3. the current transaction would lead to stock inconsistencies.
 System ResponseINCLUDE ISR_VERARBEITUNG
 ProcedureCheck your entries. If necessary, make the required transfer postingsfor material &V1& in plant &V2&.
 |