Diagnosis No entries exist in product allocation controlling (maintain viewV_T190) for the product allocation procedure. System Response Product allocation is not carried out. The order quantity is confirmedat the level of the available or requested quantity. Procedure If you do not want to use the product allocation procedure, no changesare necessary. If you want product allocation to be carried out for the materialsusing this procedure, further product allocation object entries must bemade in controlling. |