Diagnosis The data entered was not the last day of a period. The end of the validity period of a product allocation object can onlyever be at the end of a period. The object can not be changed within aperiod, because a product allocation (selected via the object in theinfo structure) is only ever valid for a whole period. System Response The date is set to the end of the corresponding period. |