Diagnosis You have not maintained a planning calendar in the material masterrecord. System Response You must assign a planning calendar to the material in the materialmaster record in order to work with flexible period lengths in theplanning calendar. Procedure Enter the planning calendar in the material master record (MRP datascreen 2). As necessary, check whether the called application supports this periodindicator. |