SAP Message VBDRV042 - Expiration date was not calculated (not planned for &1)

Diagnosis
The date of production was derived, but not the shelf life expirationdate.
The shelf life expiration date has not been changed.

System Response
At this point, you could calculate the shelf life expiration date. Ithas not been calculated here because calculation is not defined forthis material.

Procedure
If you want to calculate the shelf life expiration date, maintain therelevant fields in the material master.