Diagnosis Factory calendar &V1& does not exist in the system. System Response The system rejects the date you have entered because it cannot check itagainst the calendar. Procedure Either create calendar &V1&, or assign another valid calendar to plantV2. Procedure for System Administration Factory calendar <(>&<)>1 for plant <(>&<)>2 does not exist. |