SAP Message UPARU127 - Planning sequence &1 does not exist

Diagnosis
You tried to access planning sequence &V1& of the planning area &V2& andplanning level &V3&. However, the sequence is not available in thesystem.

System Response
Processing is terminated.

Procedure
This error can have various causes. Check whether one of the followingdescriptions applies to the current situation, and carry out thesuggested tasks:

  • Sequence name written incorrectly: You have entered the name of
  • the desired sequence incorrectly.
    Solution: Check your entry and correct the spelling of thesequence name.
    • Incomplete transport: The planning sequence exists in another
    • client or in another system, but was not transported into the currentclient or the current system.
      Solution: Transfer the missing sequence with a subsequenttransport from the source client or system.
      • Incomplete copy: The planning sequence was created by copying a
      • planning area or a planning level, without copying the planning sequence
        V1.
        Solution: Transfer the missing sequence, by copying it in thecontext of the planning level in which it was created, and inserting itinto the context of the current planning level.
        If none of the described situations apply, then inform your systemadministrator.