Diagnosis The selected periods do not fit with the valid timeframe of the budgettype. The first day of the first selected period must be later than the startdate of the selected budget type. The last day of the last period must be earlier than the end date of theselected budget type. The first day of the first selected period is: &SYST-MSGV1& The start date of the budget type is: &SYST-MSGV2& The last day of the last selected period is: &SYST-MSGV3& The end date of the budget type is: &SYST-MSGV4& Procedure Selection periods that fit with the valid timeframe of the budget type. |