SAP Message UPARI311 - Type or unit of budget keyfigure is wrong

Diagnosis
Budget key figures that can be assigned to a key figure set must havethe following type/unit:

  • Key figure type = Amount

  • Date type = Currency field, stored as DEC

  • Other values of these attributes are not possible.
    Key figure &V1& has key figure type &V2& and data type &V3&.

    Procedure
    Change the attributes of key figure &V1& to the possible values orassign another budget key figure to the key figure set.