Diagnosis V1 formula(s) from sem business planning and simulation (sem-bps)used in the value driver tree has/have a more recent time stamp thanthe structure of the value driver tree. It is possible that the treestructure no longer mirrors the planned mathematical dependencies. Procedure Rebuild the tree structure. Select the root node of the value drivertree and choose Add measures automatically >. |