|
Diagnosis Customizing of the logs assigned to task &V1& is inconsistent. Period category-dependent logs have already been assigned to the task.However, no> periods are assigned to these period categories.Procedure Compare the settings of task &V1& with the Customizing settings of theperiod categories. The following alternatives exist:
- Modify the period categories.
- Delete the log assignment and reassign the logs. Use consistent period
categories when doing this.
|