Diagnosis The log assignment for task &V1& is inconsistent: Logs have already beenassigned to the task on the basis of the period category. However, thelogs come from different period category groups. This is aninconsistency because all logs at a given point in time must belong toonly one period category group. Note This kind of inconsistency always occurs when you assign logs to thetask for, say, date A (for example, 012/2002) and then, afterwards ,> you assign logs to the task for an earlier >date B (forexample, 012/2001). And you use different period category groups for thetwo dates A and B.System Response All logs that do not belong to period category group '&V2&' will bedeleted. Procedure The following options are available for correcting the inconsistency:
- Delete the log assignment and reassign logs with the desired period
category group.
- On the other hand, if period category group '&V2&' is indeed the correct
period category group for this date, you can confirm the log assignmentsright away by saving. In the future, you can avoid inconsistencies between log assignmentsmade at different times, you should always make the earlier logassignments first, and then the later assignments.
|