Diagnosis At least three meter readings must be entered on one day. One of theseis a technical> meter reading. This means it is entered during atechnical operation. However, there are at least two other meter readings that are relevantfor billing. Because you are using a Japanese Billing Period>, a conflicthas arisen that can no longer be properly resolved. The valid, available conflict solutions> normallyonly solve conflict between one> technical meter reading andone> billing-relevant meter reading. Therefore, you must reduce the complexity of this conflict by deleting ameter reading that is not required for billing. If a final or periodic meter reading is available, the periodic meterreading is not necessary and the final meter reading has the priority. |