Diagnosis A conflict has arisen between two technical meter readings that arevalid on the same activity date: MR document &V1& (with technical> MR reason &V2&) MR document &V3& (with technical> MR reason &V4&) This does not make any sense, since these changes can no longer beprocessed in billing, which only takes place for specific dates>.Procedure Regular procedure:> If several technical changes> are made on the same date, they mustbe executed at the same time>.
- One> meter reading suffices for device removal, changes to the
installation structure, register descriptions, device allocation,disconnection and reconnection.
|