Diagnosis You want to enter a meter reading result on activity day &V1&. There are at least &V2& unnecessary meter readings on this day thatdisrupt the resolution of a conflict, which is caused by the meterreading category: Move-in/installation (meter reading reason &V4&). Note for error analysis: Meter reading document number &V3& already exists for this. Procedure
- Simplify this collection of meter readings by deleting unnecessary meter
readings.
- Do not leave any unnecessary meter readings for this day.
- Only meter readings that trigger billing> and technical meter
readings are important. For example, periodic meter readings> orchanges to the installation structure>. Move-in> is alsoimportant.
|